| Plan Review Notes For Project Z18110023 |
| Project Number |
Z18110023 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-12-10 10:57:30 | Z18110023_JFK NORTH HOSPITAL MAJOR PD AMENDMENT | | | (NOVEMBER 13, 2018 SUBMITTAL) | | | TRAFFIC STUDY | | | 1. PLEASE PROVIDE COUNTY TPS LETTER. | | | 2. IN THE TRAFFIC STUDY, THE SOUTHERN DRIVEWAY DOES NOT | | | PERMIT EGRESS VEHICLES TO MAKE LEFT-TURN. PLEASE REVISE | | | THE TRIP ASSIGNMENT. | | | SITE PLAN | | | 3. ON SHEET C300, PROVIDE CROSSWALK FROM THE BUILDING | | | TO THE OPPOSITE SIDE OF THE INTERNAL ROADWAY. ALSO | | | PROVIDE PEDESTRIAN CURB RAMP. | | | 4. ON SHEET C301, PROVIDE AUTOTURN PATH TO VERIFY IF A | | | PASSENGER CAR CAN MAKE RIGHT-TURN INTO THE FIRST | | | PARKING AISLE ON THE SOUTH. | | | 5. ON SHEET C301, PROVIDE PEDESTRIAN CONNECTION BETWEEN | | | THE EXISTING PEDESTRIAN CONNECTION NEAR THE MATCH LINE | | | WITH SHEET C300 AND THE PROPOSED BUILDING . | | | 6. PROVIDE BICYCLE PARKING NEAR THE PROPOSED BUILDINGS. | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | |
| |
Print |
|