2018-12-11 08:17:48THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. SHOW THE MILL AND RESURFACING LIMITS OF PUBLIC
 ROADS. SEE CWPB?S STANDARD DETAIL GC-9 TO DETERMINE THE
 LIMITS.
  
 2. SHOW THE STORM PIPE ON BLANCHE STREET TO BE UPSIZED
 TO 36? BEGINNING FROM THE CATCH BASIN ON THE WEST SIDE
 OF ELIZABETH AVE.
  
 3. ADD ROOT BARRIERS BETWEEN TREES AND THE EXFILTRATION
 TRENCHES AND OTHER UTILITY PIPES WITHIN 10 FEET OF THE
 TREES.
  
 4. PROVIDE EXISTING INVERT ELEVATIONS OF THE SANITARY
 SEWER SYSTEM.
  
 5. PROVIDE SUFFICIENT HORIZONTAL CLEARANCE (MINIMUM 5
 FEET) BETWEEN THE OUTSIDES OF THE PROPOSED STORM AND
 EXISTING SANITARY SEWER ON CLARE AVE.
  
 6. SITE APPEARS TO BE WITHIN A SPECIAL FLOOD HAZARD
 AREA. MINIMUM 2 FEET OF FREE BOARD IS REQUIRED FOR
 STRUCTURES AND EQUIPMENT WITHIN A SFHA.
  
 7. PUBLIC UTILITIES DEPARTMENT TO APPROVE ANY NON-SOD
 PLANTINGS WITHIN 10 FEET OF A PUBLIC UTILITY LINE.
  
 8. THERE APPEARS TO BE INSUFFICIENT COVER (~13 INCHES)
 OVER THE STORM PIPE FROM STRUCTURE S-304.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP APPROVAL PRIOR TO
 STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120