| Plan Review Notes For Project Z18110018 |
| Project Number |
Z18110018 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2019-11-01 10:49:55 | SITE PLAN COMMENTS: | | | 1. COORDINATE WITH FDOT ON A MAINTENANCE AGREEMENT FOR | | | THE USE OF PAVERS WITHIN FDOT RIGHT-OF-WAY. (THIS | | | COMMENT WILL BE PART OF THE CONDITIONS OF APPROVAL) | | | 2. PROVIDE A BUS STOP EASEMENT OF 14 FEET BY 8 FEET | | | WITHIN THE PROPERTY RIGHT-OF-WAY AT THE NORTHEAST | | | CORNER OF THE SITE. | | | 3. PROVIDE AUTOTURN PATHS FOR SERVICE VEHICLES TURNING | | | IN AND OUT OF THE ALLEY, AND SHOW THAT A DELIVER | | | VEHICLE PARKING IN THE LOADING ZONE WOULD NOT IMPEDE | | | VEHICLE MANEUVERS. | | | 4. MAINTAIN THE SAME SIDEWALK LEVEL CROSS THE DRIVEWAYS | | | ON BOTH 27TH STREET AND 28TH STREET. | | | 5. REPAVE BOTH SIDES OF 27TH STREET AND 28TH STREET AND | | | FOR 50 FEET FROM EITHER SIDE OF THE UTILITY TIE IN PER | | | ENGINEERING STANDARD. | | | 6. RECONSTRUCT THE CROSSWALKS ACROSS 27TH STREET AND | | | 28TH STREET AT BROADWAY DUE TO CURB RECONSTRUCTION. | | | | | | | | | TRAFFIC STUDY COMMENTS: | | | 7. (PREVIOUS COMMENT) PROVIDE COUNTY TPS LETTER. | | | 8. (PREVIOUS COMMENT) TABLES 2 AND 5: SOME OF THE | | | OPERATIONAL ANALYSIS RESULTS DO NOT MATCH THE RESULTS | | | IN THE SYNCHRO OUTPUTS. PLEASE REVISE. | | | 9. PLEASE INCLUDE SYNCHRO OUTPUTS FOR THE FUTURE | | | CONDITIONS WITH PROJECT TRAFFIC. APPENDICES D AND E ARE | | | MISSING. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| |
Print |
|