| Plan Review Notes For Project Z18110018 |
| Project Number |
Z18110018 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-05-20 13:44:27 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 4/5/2019 PACKAGE: | | | | | | 1. ONLY USE RCP FOR DRAINAGE PIPE WITHIN PUBLIC | | | RIGHT-OF-WAY. | | | | | | 2. ADD VERTICAL DATUM REFERENCE AND CONVERSION EQUATION | | | TO NGVD1929 TO SHEET C7.1. | | | | | | 3. PROVIDE CROSS SECTIONS FOR 27TH AND 28TH STREETS | | | SHOWING THE STEPS AND PROPOSED SLOPE OF THE PAVEMENT | | | AND SIDEWALK. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
| |
Print |
|