| Plan Review Notes For Project Z18110014 |
| Project Number |
Z18110014 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-02-19 09:39:03 | 1. THE RESPONSE INDICATED THAT THE DIAGONAL STRIPED | | | AREA NEAR THE EXIT OF THE DRIVE-THROUGH IS USED TO | | | ACCOMMODATE LOADING TRUCK. HOWEVER, ACCORDING TO SHEET | | | FSP-0.1, LOADING FOR BUILDING M IS PROVIDED BY THE 10' | | | X 50' LOADING SPACES IN BUILDING J. THEREFORE, IT IS | | | ASSUMED THAT NO LOADING TRUCKS WOULD BE ON-SITE IN | | | BUILDING M. IF LOADING IS TO TAKE PLACE ON-SITE, PLEASE | | | PROVIDE A DESIGNATED LOADING SPACE AND PROVIDE TRUCK | | | AUTOTURN PATHS TO ILLUSTRATES TRUCK MOVEMENTS. | | | OTHERWISE, CONSIDER USING RAISED CURB INSTEAD OF | | | DIAGONAL STRIPING NEAR THE EXIT OF THE DRIVE-THROUGH | | | LANE TO AVOID TWO VEHICLES LEAVING THE STOP BAR AT THE | | | SAME TIME. MOUNTABLE CURB COULD BE USED TO ACCOMMODATE | | | VEHICLE MOVEMENTS IF NEEDED. | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] |
| |
Print |
|