Date Text
2019-02-15 10:58:58THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 1/30/2019 SUBMITTAL PACKAGE:
  
 1. PROVIDE THE DIMENSION BETWEEN THE ADJACENT PARALLEL
 PARKING STRIPES ON THE STANDARD (PARKING) SPACE WITH
 WHEEL STOP DETAIL. [REPEAT COMMENT]
  
 2. THE VERTICAL DATUM ON THE SURVEY IS NGVD1929. THE
 VERTICAL DATUM ON THE ENGINEERING PLANS IS LISTED AS
 NAVD1988. ALL PLANS SHOULD REFERENCE THE SAME VERTICAL
 DATUM AND PROVIDE A CONVERSION TO THE CITY'S VEERTICAL
 DATUM, NGVD1929.
  
 3. LIST THE VERTICAL DATUM AND RELATIONSHIP TO NGVD
 1929 ON EVERY ENGINEERING SHEET THAT SHOWS AN
 ELEVATION. THIS APPLIES TO SHEETS C-101, C-400, C-600.
 [REPEAT COMMENT]
  
 4. ON SHEET C-500, PG&D NOTE #1 STATES ALL ELEVATIONS
 ARE REFERNCED TO NGVD 1929. THE NOTE AT THE BOOTOM LEFT
 OF THE SHEET STATES PLANS ARE IN NAVD1988. PLEASE
 CLARIFY.
  
 5. CONSIDER ADDING ROOT BARRIERS BETWEEN THE TREES AND
 THE DRAINAGE PIPE(S). STAFF COULD NOT FIND WHERE THESE
 ROOT BARRIERS ARE CALLED OUT ON THE LANDSCAPE PLANS.
  
 6. VERFY THE TOP OF PIPE ELEVATION LISTED FOR THE STORM
 PIPE IN CROSSING #1 ON SHEET C-600..
  
 7. UPDATE THE FLOOD ZONE INFORMATION ON THE ALTA LAND
 TITLE SURVEY.
  
 8. PROPOSED 3-STORY OFFICE ADDITION MAY BE WITHIN A
 SPECIAL FLOOD HAZARD AREA (SFHA). THE PROPOSED FFE IS
 LISTED AS 15.00, WHICH IS LESS THAN TWO FEET ABOVE THE
 BASE FLOOD ELEVATION OF 14.0 SHOWN ON THE SURVEY.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved