| Plan Review Notes For Project Z18100039 |
| Project Number |
Z18100039 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2018-12-10 16:40:43 | THE FOLLOWING COMMENTS ARE FROM THE REIVIEW OF THE | | | 12/4/2018 SUBMITTAL PACKAGE: | | | | | | 1. PROVIDE THE DIMENSION BETWEEN THE ADJACENT PARALLEL | | | PARKING STRIPES ON THE STANDARD (PARKING) SPACE WITH | | | WHEEL STOP DETAIL . | | | | | | 2. THE VERTICAL DATUM ON THE SURVEY IS NAVD1988. | | | PROVIDE THE RELATIONSHIP BETWEENNAVD1988 AND NGVD1929 | | | ON THE SURVEY. | | | | | | 3. LIST THE VERTICAL DATUM ON EVERY ENGINEERING SHEET | | | THAT SHOWS AN ELEVATION. THE VERTICAL DATUM SHOULD | | | MATCH THE DATUM USED ON THE SURVEY AND PROVIDE THE | | | CONVERSION EQUATION TO NGVD1929. | | | | | | 4. SHEET C-500 (PAVING, GRADING AND DRAINAGE PLAN) | | | INDICATES THE VERTICAL DATUM ON THE SHEET IS NGVD1929. | | | | | | 5. CONSIDER ADDING ROOT BARRIERS BETWEEN THE TREES AND | | | THE DRAINAGE PIPE(S). | | | | | | 6. SHEET C-600: THE LEFT SIDE OF THE PIPE CONFLICT | | | NOTES DID NOT PRINT. | | | | | | 7. VERIFY INVERT ELEVATIONS FOR DRAINAGE STRUCTURES | | | ST-01 AND ST-02. | | | | | | 8. PROPOSED 3-STORY OFFICE ADDITION MAY BE WITHIN A | | | SPECIAL FLOOD HAZARD AREA (SFHA). STRUCTURES WITHIN | | | SFHA ARE TO HAVE A MINIMUM OF TWO FEET OF FREEBOARD | | | ABOVE THE SFHA FLOOD ELEVATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
| |
Print |
|