| Date |
Text |
| 2018-11-09 12:36:43 | COMMENTS PER RICK ROSSANO, PROJECT COORDINATOR, CITY OF |
| | WPB ENGINEERING |
| | AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR |
| | MORE INFORMATION, REFER TO THE LINK BELOW: |
| | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI |
| | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL |
| | |
| | SUPPLY POLLUTION CONTROL PLAN SHOWING: |
| | A) WHERE SILT SCREENS WILL BE INSTALLED, |
| | B) SHOW THE PROTECTION OF ALL ON-SITE CATCH BASINS |
| | C) SHOW PROTECTION OF ALL OFF-SITE CATCH BASINS |
| | D) INCLUDE DETAILS AS TO THE TYPE OF PROTECTION USED ON |
| | THE CATCH BASINS |
| | E) SHOW HOW SITE DIRT WILL NOT BE TRACKED INTO THE |
| | ROADS |
| | HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/DOCS/ |
| | CONST_ACTIVITY.PDF |
| | HTTP://WWW.PBCO-NPDES.ORG/CONSTRUN.HTML |
| | HTTP://WWW.DEP.STATE.FL.US/WATER/STORMWATER/NPDES/FAQS. |
| | HTM |
| | |
| | GENERAL DRIVEWAY COMMENTS |
| | 1) DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND |
| | VERTICALLY. CALL OUT SETBACK. |
| | 2) SHOW PROPOSED CONCRETE APRON(S), CITY STANDARD |
| | DETAIL IS REQUIRED, SEE LINK BELOW: HTTP://WPB.ORG/DEPA |
| | RTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICA |
| | TIONS |
| | 3) IF USING PAVERS IN THE APRON AREA OF THE PROPOSED |
| | DRIVEWAY, YOU MUST EXECUTE A PAVER DRIVEWAY AGREEMENT, |
| | WHICH CAN BE OBTAINED HERE: HTTP://WPB.ORG/DEPARTMENTS/ |
| | ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | GENERAL - |
| | |
| | THE FOLLOWING COMMENTS ARE INCLUDED FOR YOUR GENERAL |
| | INFORMATION AND USE. THEY MAY NOT BE SITE-SPECIFIC, BUT |
| | WILL SOON BE ADDED TO CITY OF WEST PALM BEACH |
| | DEVELOPMENT PERMIT APPLICATIONS. |
| | |
| | OBTAIN AVAILABLE UTILITIES OWNED BY THE CITY OF WEST |
| | PALM BEACH WITHIN THE PUBLIC RIGHT-OF-WAY FOR THE |
| | ENTIRE EXTENT OF THE LIMITS OF YOUR PROJECT. IDENTIFY |
| | TYPE OF UTILITY, LOCATION, PIPE MATERIAL, AGE AND SIZE. |
| | SUBMIT A FORMAL RECORDS REQUEST (WITH SUNSHINE DESIGN |
| | TICKET NUMBER) TO JANICE TARBILL IN THE WPB ENGINEERING |
| | SERVICES DEPARTMENT AT [email protected]. SUBMIT PROOF |
| | OF THE FORMAL RECORD REQUEST TO THE CITY. NOTE: RECORD |
| | INFORMATION PROVIDED BY THE CITY IS FOR REFERENCE ONLY. |
| | PERFORM FIELD VERIFICATION OF EXACT LOCATION AND DEPTH |
| | BY SOFT-DIGS, POT-HOLING, ETC. |
| | |
| | PROVIDE SCHEMATIC UTILITY ENGINEERING DRAWINGS (24IN X |
| | 36IN FORMAT) AT A LEGIBLE ENGINEERING SCALE AND |
| | PREPARED BY A LICENSED PROFESSIONAL ENGINEER. |
| | |
| | PROVIDE STATEMENT, CONFIRMED BY ENGINEERING ANALYSIS, |
| | THAT THE EXISTING UTILITY MAINS SERVING THE PROPOSED |
| | PROJECT ARE ADEQUATE. PROVIDE CALCULATIONS OF EXISTING |
| | AND PROPOSED WATER & SEWER DEMANDS (AVERAGE, MAXIMUM, |
| | PEAK) AND FIRE FLOW DEMAND. CALCULATIONS SHALL BE PER |
| | FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER. |
| | |
| | LOCATIONS, SIZES AND OTHER APPROPRIATE DESCRIPTIONS OF |
| | THE FOLLOWING EXISTING OR PROPOSED UTILITY FACILITIES: |
| | ? WATER MAINS, SERVICE CONNECTIONS, VALVES, METERS AND |
| | ANY SPECIAL STRUCTURES SUCH AS PUMP STATIONS; |
| | ? SANITARY SEWER MAINS, SERVICE CONNECTIONS AND ANY |
| | SPECIAL STRUCTURES OR FACILITIES SUCH AS LIFT STATIONS, |
| | SEPTIC SYSTEMS; AND |
| | ? PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER MAINS |
| | ALONG ENTIRE PROJECT FRONTAGE. |
| | STORMWATER DRAINAGE MAINS, CHANNELS, RETENTION OR |
| | DETENTION PONDS, AND OTHER MAJOR DRAINAGE FACILITIES; |
| | FLOW DIRECTION OF SURFACE RUNOFF. |
| | SHOW LOCATION OF ALL EXISTING DRY/FRANCHISE UTILITIES, |
| | AND ALL RELATED EASEMENTS ON THE SITE OR ON IMMEDIATELY |
| | ADJACENT PROPERTY. |
| | PROVIDE PROFILE VIEW OF ALL PROPOSED UTILITIES WITHIN |
| | THE RIGHT-OF-WAY TO BE OWNED AND MAINTAINED BY THE |
| | CITY. CALL OUT VERTICAL CLEARANCES OF UTILITY CROSSINGS |
| | WITH CITY AND DRY/FRANCHISE UTILITIES. IDENTIFY TYPE OF |
| | UTILITY/OWNERSHIP, LOCATION/DEPTH, PIPE MATERIAL, SIZE. |
| | SHOW CONDITIONS ON IMMEDIATELY ADJACENT PROPERTY THAT |
| | HAVE A DIRECT IMPACT ON THE PROPOSED DEVELOPMENT |
| | |
| |
Print |