2019-02-15 11:20:10THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 1/23/19 SUBMITTAL:
  
 1. THE DRAINAGE MODELING RESULTS SHOW THE ROUTED PEAK
 25-YEAR 3-DAY STAGE IS 16.78. THE SPOT GRADES AT THE
 DRIVEWAYS SHOULD BE AT THIS ELEVATION OR HIGHER.
  
 2. NOTE THE EAST SIDEWALK CURB RAMP APPEARS TO SLOPE
 DOWNWARD AND THE CROWN OF THE DRIVEWAY IS SOUTH OF THE
 SIDEWALK. CREATE A HIGH POINT IN THE SIDEWALK TO
 CONTAIN THE 25-YEAR 3-DAY STORM OR MOVE THE DRIVEWAY
 HIGH POINT BEFORE THE SIDEWALK.
  
 3. SHOW AND LABLE A BERM ALONG THE EAST AND SOUTH
 PROPERTY LINES.
  
 4. CHECK THE ORIENTATION OF THE ARROW ON THE LEFT SIDE
 OF THE DRIVEWAY TO COMMUNITY DRIVE AND THE PLACMENT OF
 THE LETTERING.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120