| Plan Review Notes For Project Z18100028 |
| Project Number |
Z18100028 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2019-02-15 11:20:10 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 1/23/19 SUBMITTAL: | | | | | | 1. THE DRAINAGE MODELING RESULTS SHOW THE ROUTED PEAK | | | 25-YEAR 3-DAY STAGE IS 16.78. THE SPOT GRADES AT THE | | | DRIVEWAYS SHOULD BE AT THIS ELEVATION OR HIGHER. | | | | | | 2. NOTE THE EAST SIDEWALK CURB RAMP APPEARS TO SLOPE | | | DOWNWARD AND THE CROWN OF THE DRIVEWAY IS SOUTH OF THE | | | SIDEWALK. CREATE A HIGH POINT IN THE SIDEWALK TO | | | CONTAIN THE 25-YEAR 3-DAY STORM OR MOVE THE DRIVEWAY | | | HIGH POINT BEFORE THE SIDEWALK. | | | | | | 3. SHOW AND LABLE A BERM ALONG THE EAST AND SOUTH | | | PROPERTY LINES. | | | | | | 4. CHECK THE ORIENTATION OF THE ARROW ON THE LEFT SIDE | | | OF THE DRIVEWAY TO COMMUNITY DRIVE AND THE PLACMENT OF | | | THE LETTERING. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |
Print |
|