Plan Review Notes
Plan Review Notes For Project Z18100028
Project Number Z18100028
Review Stop STORM
Sequence Number 2
Notes
Date Text
2018-12-10 16:18:18THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 12/4/2018 SUBMITTAL PACKAGE:
  
 1. SHOULD SECTION D-D INCLUDE VALLEY GUTTER OR DROP
 CURB ACROSS THE DRIVEWAY?
  
 2. CHECK THE SPOT GRADES ALONG THE DRIVEWAY TO
 COMMUNITY DRIVE. THERE IS A PROPOSED GRADE OF 15.10
 BETWEEN 15.06 AND THE CATCH BASIN.
  
 3. NO DRAINAGE CALCULATIONS WERE SUBMITTED SO STAFF
 DOES NOT KNOW HOW THE WEIR ELEVATION OF 16.36 FEET WAS
 DETERMINED. NOTE THIS WEIR ELEVATION IS HIGHER THAN:
 (A) THE TRENCH GRATE ELEVATION ON THE NORTH DRIVEWAY TO
 COMMUNIITY DRIVE;
 (B) THE HIGHEST SPOT GRADE FOR THE DRIVEWAY TO MILITARY
 TRAIL; AND
 (C) THE TOP OF BANK OF THE DETENTION AREA IN THE
 SOUTHEAST AREA OF THE SITE.
  
 STORMWATER RUNOFF IN EXCESS OF THE EXFILTRATION TRENCH
 DESIGN WILL DISCHARGE OFFSITE VIA (A) AND (B) BEFORE
 FLOWING OVER THE WEIR.
  
 4. ON THE LANDSCAPE PLANS SHOW THE EXISTING STORM PIPE
 FROM THE CONTROL STRUCTURE TO THE INLET ON COMMUNITY
 DRIVE (REPEAT COMMENT).
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]