| Date |
Text |
| 2018-11-09 15:38:54 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. FIRMS WERE ISSUED IN 2017. UPDATE THE FLOOD ZONE |
| | INFORMATION ON THE SURVEY. |
| | |
| | 2. MINIMUM 2 FEET OF FREEBOARD IS REQUIRED FOR |
| | STRUCTURES WITH SPECIAL FLOOD HAZARD AREAS. |
| | |
| | 3. PROVIDE SUFFICIENT VERTICAL CLEARANCE FOR A VACUUM |
| | TRUCK TO ACCESS AND CLEAN THE DRAINAGE STRUCTURES UNDER |
| | THE BUILDING. |
| | |
| | 4. AN EASEMENT WILL BE REQUIRED FOR THE DRAINAGE PIPE |
| | CROSSING THE PARCEL ON THE EAST SIDE OF FLAGLER DRIVE. |
| | |
| | 5. PROVIDE A VIDEO IN A FORMAT ACCEPTABLE TO THE |
| | ENGINEERING SERVICES DEPARTMENT OF THE STORM PIPE FROM |
| | THE CATCH BASIN ON FLAGLER DRIVE TO THE LAKE WORTH |
| | LAGOON. |
| | |
| | 6. SHOW THE EXISTING CATCH BASIN IN THE RIGHT OF WAY ON |
| | THE WEST SIDE OF FLAGLER DRIVE. |
| | |
| | 7. THE PLANTING PLAN SHOWS A PROPOSED PALM TREE OVER |
| | THE EXISTING STORM PIPE ON THE EAST SIDE OF FLAGLER |
| | DRIVE. |
| | |
| | 8. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS |
| | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION |
| | EQUATION TO NGVD 1929 IS PROVIDED. THE CONVERSION |
| | EQUATION IS NEEDED ON THE SURVEY. |
| | |
| | 9. PROVIDE THE CONVERSION EQUATION FOR THE VERTICAL |
| | DATUM TO NGVD1929 ON THE ENGINEERING PLANS. |
| | |
| | 10. FDOT IS CURRENTLY CONSTRUCTING A PROJECT ON FLAGLER |
| | DRIVE AND SOUTHERN BLVD THAT MAY AFFECT THE DESIGN OF |
| | THIS PROJECT. IT IS RECOMMENDED DESIGN PLANS AND/OR |
| | AS-BUILT PLANS OF THAT PROJECT BE OBTAINED. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE SFWMD ERP FOR THE DEVELOPMENT. |
| | |
| | 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |