Date Text
2019-03-05 17:36:18THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 FEBRUARY 19, 2019 SUBMITTAL PACKAGE:
  
 1. REVISE THE NGVD 1929 FFE FOR THE PROPOSED BUILDING
 (ON SEVERAL CIVIL SHEETS). VERTICAL DATUM CONVERSION
 BETWEEN NAVD 1988 AND NGVD 1929 IS SHOWN AS 1.54 FEET.
 1.53 FEET WAS USED FOR THE FFE CONVERSION.
  
 2. STAFF CANNOT FIND THE VERTICAL DATUM REFERENCE AND
 CONVERSION EQUATION TO NGVD 1929 ON SHEET C-6 (REPEAT
 COMMENT).
  
 3. VERIFY THE STORM PIPE SIZE (15" HDPE) LISTED FOR
 UTILITY CROSSINGS 1 AND 2 ON SHEET C-6. SHEET C-5 SHOWS
 AN 18" HDPE ON THE SOUTH SIDE OF THE TYPE 'V' GUTTER
 INTLET.
  
 4. SHEET C-5 SHOWS A SPOT GRADE OF 18.25 FEET NAVD 1988
 IN THE PERVIOUS AREA IN THE MIDDLE OF THE PAVED DRIVE
 AND ALSO BETWEEN CONTOURS 17 AND 18. AN ADDITIONAL 18
 CONTOUR LINE IS NEEDED SOUTH OF THE SPOT GRADE.
  
 5. BUILDING APPEARS TO BE PROPOSED WITHIN A SPECIAL
 FLOOD HAZARD AREA (SFHA). THE FEMA FLOOD ELEVATION
 SHOULD BE LISTED ON THE SURVEY. MINIMUM 2 FEET OF
 FREEBOARD IS REQUIRED FOR STRUCTURES CONSTRUCTED WITHIN
 A SFHA.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120