Plan Review Notes
Plan Review Notes For Project Z18100016
Project Number Z18100016
Review Stop STORM
Sequence Number 2
Notes
Date Text
2019-01-22 09:14:49THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 JANUARY 7, 2019 SUBMITTAL PACKAGE:
  
 1. VERIFY THE VERTICAL DATUM USED ON THE ENGINEERING
 PLANS. DATUM NOTES ON SHEETS C-1, C-3, C-5, AND C-7
 INDICATE VERTICAL DATUM USED IS NGVD 1929 BUT THE GRADE
 ELEVATIONS SHOWN ON SHEET C-5 APPEAR TO BE REFERENCED
 TO NAVD 1988.
  
 2. THERE ARE TWO CONVERSION EQUATIONS PROVIDED FOR THE
 NGVD1929 AND NAVD1988 RELATIONSHIP (1.504 FEET AND 1.53
 FEET).
  
 3. LABEL THE VERTICAL DATUM ON SHEET C-6 AND PROVIDE
 CONVERSION EQUATION TO NGVD 1929.
  
 4. ON SHEET C-6, LABEL THE LOCATION OF THE UTILITY
 CROSSINGS CORRESPONDING TO THE UTILITY CROSSING
 SCHEDULE AT THE BOTTOM OF THE SHEET.
  
 5. SITE NOTE 3 ON SHET C-4 - PBC MAY HAVE UPDATED THEIR
 TP-13 TYPICAL PAVEMENT MARKINGS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]