| Notes |
| Date |
Text |
| 2018-11-09 08:21:11 | 1. NEW EASEMENT FOR LIFT STATION IS REQUIRED. | | | 2. METER NEEDS TO BE AT THE RIGHT-OF-WAY LINE. | | | 3. OVERALL MASTER WATER AND SEWER PLANS NEEDS TO BE | | | DEVELOPED SHOWING EXISTING INFRASTRUCTURE AND | | | EASEMENTS. | | | 4. NEED LEVEL OF SERVICE FOR WATER AND SEWER. |
| |