| 2018-11-09 14:04:02 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS |
| | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION |
| | EQUATION TO NGVD 1929 IS PROVIDED. THE CONVERSION |
| | EQUATION IS NEEDED ON THE SURVEY. |
| | |
| | 2. LABEL THE VERTICAL DATUM ON THE ENGINEERING PLANS |
| | AND PROVIDE THE CONVERSION EQUATION TO NGVD1929. |
| | |
| | 3. CERTAIN LAYERS APPEAR TO BE MISSING ON THE |
| | ENGINEERING PLANS. FOR EXAMPLE, SHEET C4 (PAVING, |
| | GRADING AND DRAINAGE PLAN) DOES NOT SHOW THE PROPOSED |
| | IMPROVEMENTS OR EXISTING WATER AND SEWER MAINS. SHEET |
| | C-5 (UTILITY PLAN) DOES NOT SHOW EXISTING WATER AND |
| | SEWER MAINS. |
| | |
| | 4. CHECK THE HGL FOR THE EXISTING DRAINAGE SYSTEM TO |
| | DETERMINE THE ADDITIONAL FLOW WILL NOT CAUSE FLOODING. |
| | |
| | 5. PROVIDE A PROJECT BOUNDARY ON SHEET C-2 (SITE PLAN) |
| | THAT CORRESPONDS TO THE LAND USE AREAS LISTED ON THE |
| | SAME SHEET. |
| | |
| | 6. PROVIDE AN STORMWATER MASTER PLAN FOR THE ENTIRE |
| | CAMPUS THAT TAKES INTO ACCOUNT FUTURE DEVELOPMENTS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE MODIFIED SFWMD ERP APPROVAL |
| | PRIOR TO STARTING CONSTRUCTION. |
| | |
| | 4. PROVIDE A COPY OF THE MODIFIED NPBCID APPROVAL PRIOR |
| | TO START OF CONSTRUCTION. |
| | |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |