Plan Review Notes
Plan Review Notes For Project Z18080018
Project Number Z18080018
Review Stop Z
Sequence Number 4
Notes
Date Text
2019-01-31 11:27:39GENERAL COMMENTS:
  
 1.) A COUNTY TRAFFIC PERFORMANCE STANDARDS (TPS) REVIEW
 LETTER, INDICATING THAT THE PROPOSED PROJECT MEETS THE
 TPS OF THE COUNTY SHALL BE SUBMITTED TO STAFF AS A
 PREREQUISITE FOR MOVING FORWARD TO A PUBLIC HEARING.
 [12/18/19 REPEAT COMMENT - STAFF IS STILL WAITING ON
 THE TPS APPROVAL LETTER FROM THE COUNTY.]
 ANY CHANGES TO A PLAN SHALL BE REFLECTED IN ALL PLANS
 IN THE APPLICATION PACKET FOR CONSISTENCY.
  
 MASTER DEVELOPMENT PLAN (SHEET MP-1) COMMENTS:
  
 1.) THE INFORMATION FOR TRACT #3 IN THE MASTER
 DEVELOPMENT PLAN (NOT TABLE) HAS NOT BEEN CHANGED.
 STAFF HAD REQUESTED THE INFORMATION BE CHANGED FROM
 "USES PERMITTED IN THIS CPD SHALL INCLUDE ALL USES
 PERMITTED BY-RIGHT WITHIN THE GC ZONING DISTRICT AND
 ADDITIONAL USES AS APPROVED PER ORDINANCE NO. 4572-15"
 TO "UP TO 14,683 SF - GFA AND ASSOCIATED PARKING."
 [12/18/2018 REPEAT COMMENT]
  
 2.) THE LEGEND NEEDS TO BE CORRECTED BASED ON REMOVED
 INFORMATION. PLEASE ADDRESS.
  
 3.) FOR THE LAND USE AND ZONING INFORMATION AND NOTES
 FOR TRACT #3: A) THERE ARE STILL DISCREPANCIES IN THE
 CALCULATIONS FOR OPEN SPACE AND PERVIOUS AREA; B)
 FIGURES FOR: IMPERVIOUS AREA, BUILDING FOOTPRINT,
 PAVEMENT/SIDEWALK, OPEN SPACE AND PERVIOUS SURFACE DOES
 NOT MATCH THE INFORMATION PROVIDED IN THE SITE PLAN
 (SHEET SP-1). PLEASE ADDRESS; C) CHECK MINIMUM OPEN
 SPACE PERCENTAGE. IT DOES NOT MATCH THE INFORMATION
 PROVIDED IN THE SITE PLAN (SHEET SP-1).
  
 SITE PLAN (SHEET SP-1):
  
 1.) PLEASE EXPLAIN/CLARIFY THE FOLLOWING CALCULATIONS:
 A) IMPERVIOUS BUILDING; B) OPEN SPACE; C) PARKING FOR
 MOTOR VEHICLES AT 9,369 SQ. FT.
  
 2.) IN THE REGULATING PLAN (SHEET SP-2), SECTION C
 DETAIL (WEST LANDSCAPE BUFFER SEEMS TO HAVE THE
 INCORRECT MEASUREMENTS (I.E. 16 FT. DEEP PARKING STALL
 NOT 18 FT. DEEP). PLEASE ADDRESS.
  
 MASTER SIGN PLAN:
  
 1.) PLEASE ADD THE REVISION DATE TO THE MASTER SIGN
 PLAN SHEETS. THE REVISION DATE IS IMPORTANT TO KEEP
 TRACK OF ALL CHANGES TO THE MASTER SIGN PLAN.
  
 ARCHITECTURAL PLANS:
 1.) THE DIMENSIONS FOR THE NORTH ELEVATION IS NOT
 CLEAR. PLEASE ADDRESS ON SHEET A-201.
  
 PHOTOMETRIC PLAN:
  
 1.) PHOTOMETRIC PLAN DOES NOT MATCH THE SITE PLAN.
 PLEASE MAKE SURE THE LATEST LAYERS FOR THE SITE PLAN
 ARE BEING USED FOR THE PHOTOMETRIC PLAN. [12/18/19
 REPEAT COMMENT]
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF
 FIFTEEN (15) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5
 INCHES X 11 INCHES AND ONE (1) SET IN 11 INCHES X 17
 INCHES, AND AN ELECTRONIC COPY OF ALL PLANS.
  
 * PLEASE NOTE THAT CHANGES ON THE RESUBMITTED PLANS MAY
 RESULT IN ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE.
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved