Plan Review Notes
Plan Review Notes For Project Z18080018
Project Number Z18080018
Review Stop STORM
Sequence Number 2
Notes
Date Text
2018-11-05 17:27:19THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 OCTOBER 26, 2018 SUBMITTAL PACKAGE:
  
 1. VERIFY THE PROPOSED CHANGES TO POND 1 ON TRACTS 3
 AND 4 WILL BE APPROVED PURSUANT TO THE DECLARATION OF
 CONVENANTS, CONDITIONS AND RESTRICTIONS AND RECIPROCAL
 EASEMENT AGREEMENT RECORDED BEGINNING ON PAGE 1743 OF
 PALM BEACH COUNTY OFFICIAL RECORDS BOOK 29483.
 SPECIFICALLY SECTION 2.1 (B) OF THE DOCUMENT STATES:
 "... THE STORM WATER DETENTION AREAS INDICATED ON THE
 SITE PLAN, AND ALL LINES, CONDUITS, PIPES AND OTHER
 APPARATUS FOR WATER DRAINAGE, AND ALL STORAGE SYSTEMS
 NECESSARY IN CONNECTION THEREWITH, SHALL BE HEREINAFTER
 CALLED THE 'WATER DETENTION AND DRAINAGE FACILITIES'."
 ... "THE WATER DETENTION AND DRAINAGE FACILITIES
 REQUIRED FOR EACH TRACT SHALL INITIALLY BE CONSTRUCTED
 BY TRACT 1 OWNER IN ACCORDANCE WITH THE SITE PLAN AND
 PURSUANT TO PLANS APPROVED BY WAWA UNDER THE WAWA
 LEASE, AS A PART OF THE INITIAL DEVELOPMENT OF THE WAWA
 IMPROVEMENTS ON TRACT 1 UNDER THE WAWA LEASE. ONCE
 CONSTRUCTED, THE WATER DETENTION AND DRAINAGE
 FACILITITES SHALL NOT BE MODIFIED, ALTERED, RELOCATED
 OR OTHERWISE CHANGED, WITHOUT THE PRIOR WRITTEN CONSENT
 OF ALL OWNERS AND WAWA (DURING THE CONTINUANCE OF THE
 WAWA LEASE)."
  
 2. VERIFY THE DRAINAGE SYSTEM (AND CALCULATIONS) FOR
 TRACT 3 INCLUDES THE RUNOFF FROM THE RIGHT-OF-WAY AS
 SPECIFIED IN SECTION 2.1 (B) OF THE ABOVE MENTIONED
 CONVERANTS AGREEMENT.
  
 3. IT IS STAFF'S UNDERSTANING THE POND 1 LOCATED ON
 TRACTS 3 AND 4 IS TO BE USED FOR THE RUNOFF FROM TRACT
 3 AND TRACT 4. THE EXISTING CONTROL STRUCTURE IN POND 1
 WILL RELEASE WATER OFFSITE VIA THE BLEEDER ORIFICE AS
 WELL WHEN THE STAGES IN THE POND EXCEED THE GRATE
 ELEVATION OF THE CONTROL STRUCTURE, SAID GRATE BEING
 OVER 4 FEET ABOVE THE POND BOTTOM. PLEASE ADVISE HOW
 THE PROPOSED STORMWATER EQUALIZEER PIPE SYSTEM ON TRACT
 3 BETWEEN POND 1 AND THE SWALE ALONG AUSTRALIAN AVE. ON
 THE WEST SIDE OF TRACT 3 WILL MAINTAIN WATER LEVELS IN
 POND 1 FOR WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION. IT APPEARS ALL OF THE WATER ENTERING THE
 POND WILL FLOW TO THE SWALE SINCE THE SWALE IS ABOUT 3
 FEET BELOW THE BOTTOM OF POND 1.
  
 4. THE DRAINAGE CALCULATIONS SHOULD INCLUDE TRACT 4
 DEVELOPMENT'S LAND USE AREAS.
  
 5. THE RESPONSES TO THE FIRST SET OF COMMENTS INDICATED
 THE SFWMD OR FDEP ERP MODIFICATION IS INCLUDED WITH
 THIS SUBMITTAL PACKAGE. THIS DOCUMENT WAS NOT FOUND.
  
 6. VERIFY THE PROPOSED SIDEWALK ALONG THE ENTRANCE ROAD
 ON AUSTRALIAN AVE. WILL MEET ADA CRITERIA. THE SURVEY
 SHOWS SPOT GRADES OF 13.50 AND 11.39 APPROXIMATELY 40
 FEET APART ALONG THE CURB RETURN EDGE OF PAVEMENT,
 WHICH IS STEEPER THAN 5% SLOPE.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERRING SERVICES DEPARTMENT
 561-494-1120
 [email protected]