| Date |
Text |
| 2018-09-18 15:55:44 | GENERAL DRIVEWAY COMMENTS |
| | 1) DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND |
| | VERTICALLY. CALL OUT SETBACK. |
| | 2) SHOW PROPOSED CONCRETE APRON(S), CITY STANDARD |
| | DETAIL IS REQUIRED, SEE LINK BELOW: HTTP://WPB.ORG/DEPA |
| | RTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICA |
| | TIONS |
| | 3) IF USING PAVERS IN THE APRON AREA OF THE PROPOSED |
| | DRIVEWAY, YOU MUST EXECUTE A PAVER DRIVEWAY AGREEMENT, |
| | WHICH CAN BE OBTAINED HERE: HTTP://WPB.ORG/DEPARTMENTS/ |
| | ENGINEERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | GENERAL NOTES: |
| | |
| | DELETE CITY OF WEST PALM BEACH FROM WATER NOTE (PBC |
| | WATER) |
| | |
| | PROVIDE APPROVAL FROM PBC WATER & SEWER FOR PROPOSED |
| | POINTS OF CONNECTION FOR WATER AND SEWER. |
| | |
| | PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF |
| | ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES, |
| | INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND |
| | SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES, |
| | METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE |
| | SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING |
| | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, |
| | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL |
| | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER |
| | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN |
| | VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS. |
| | |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION FACILITIES LOCATED ON |
| | THE RIGHT-OF-WAY. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO |
| | PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1098 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 246-9525 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | MANNY GONZALEZ |
| | SENIOR ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| |
Print |