| Notes |
| Date |
Text |
| 2018-10-19 16:17:08 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | OCTOBER 10, 2018 REVIEW SUBMITTAL PACKAGE. | | | | | | 1. NAVD TO NGVD CONVERSION EQUATION MISSING FROM THE | | | SURVEY. | | | | | | 2. MOVE THE YARD DRAINS AND ANY FLOOR GRATES OFF OF THE | | | SOUTH PROPERTY LINE. | | | | | | 3. TCE WILL LIKELY BE NEEDED FOR GROUT FILLING THE | | | STORM PIPE UNDER THE BUILDING AT THE SOUTHEAST CORNER | | | OF S. DIXIE HWY AND OKEECHOBEE BLVD. | | | | | | 4. ADD A LABEL ON THE ENGINEERING PLANS FOR THE LINE | | | WORK CONSISTING OF DASH LINE BETWEEN SMALL RECTANGLES. | | | THE ENGINEERING PLANS SHOW AN EXISTING DRAINAGE PIPE | | | CONNECTING TO THIS SYSTEM ON DIXIE HIGHWAY. | | | | | | 5. THE SURVEY DOES NOT SHOW THE DRAINAGE MANHOLE THAT | | | THE EXISTING DRAINAGE PIPE UNDER THE BUILDING MENTIONED | | | IN #3 ABOVE CONNECTS TO AS SHOWN ON THE ENGINEERING | | | PLANS. CONFIRM THERE IS AN EXISTING STRUCTURE OR IF ONE | | | IS PROPOSED. | | | | | | 6. AN EASEMENT WILL BE NEEDED FROM THE ADJACENT | | | PROPERTY OWNER FOR THE PROPOSED DRAINAGE SYSTEM BETWEEN | | | S-107 AND S-106 ON THEIR PROPERTY. DID YOU CONSIDER | | | RUNNING A PIPE SOUTH OUT OF S-106 AND TYING INTO THE | | | CURB INLET ON DIXIE HWY? | | | | | | 7. WHY IS THERE A BREAK IN THE EXFILTRATION TRENCH | | | BETWEEN S-104 AND S-105? | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | | | | |
| |
Print |
|