| Plan Review Notes For Project Z18060025 |
| Project Number |
Z18060025 |
|
| Review Stop |
STORM |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2018-10-01 15:54:54 | THE COMMENT BELOW IS BASED ON THE REVIEW OT THE | | | SEPTEMBER 24, 2018 SUBMITTAL PACKAGE: | | | | | | 1. IT APPEARS THE PROPOSED DRAINAGE SYSTEM AROUND THE | | | PROPOSED ADOPTION CENTER IS A LOOPED SYSTEM. IS IT | | | POSSIBLE TO REMOVE ONE OF THE PIPES CONNECTED TO | | | DRAINAGE STRUCTURE ST-9 (OR ANOTHER STRUCTURE) WITHOUT | | | AFFECTING THE HYDRAULICS OF THE DRAINAGE SYSTEM. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGIENERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
| |
Print |
|