| 2018-07-11 08:07:52 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. CONSIDER FLATTENING THE PAVEMENT SLOPE OF THE |
| | PARKING LOT ALONG THE SOUTH PROPERTY LINE SOUTH OF THE |
| | TWO-STORY DOME BUILDING. THE BACKSLOPE TO THE PROPERTY |
| | LINE APPEARS TO BE 4:1 OR STEEPER. CONFIRM THE PROPOSED |
| | LANDSCAPING CAN BE PLANTED ON THIS SLOPE. |
| | |
| | 2. AVOID DIRECT RUNOFF TO ADJACENT PROPERTIES BY |
| | CREATING A SHALLOW SWALE AT THE BASE OF ANY FILL |
| | SLOPES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE MODIFIED SFWMD ERP APPROVAL |
| | PRIOR TO STARTING CONSTRUCTION. |
| | |
| | 4. N. MILITARY TRAIL IS MAINTAINED BY PALM BEACH |
| | COUNTY. PERMITS WILL BE NEEDED FROM THE COUNTY FOR THE |
| | DRIVEWAY CONNECTION AND OTHER WORK IN THE RIGHT-OF-WAY. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |