2018-10-30 16:10:24THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 OCTOBER 9, 2018 SUBMITTAL PACKAGE:
  
 1. SHEETS SURVEY 1 AND SURVEY 2 ARE NOT PLOTTED AT THE
 INDICATED SCALE.
  
 2. THE LANDSCAPE PLANS SHOW PROPOSED GUMBO LIMBO TREES
 WTHIN FOUR FEET OF THE EDGE OF THE EXFILTRATION TRENCH.
 HOW WILL THE TREE ROOTS BE PREVENTED FROM DAMAGING THE
 EXFILTRATION SYSTEM. CAN THE EXFILTRATION SYSTEM BE
 MOVED UNDER THE LONG ENTRANCE ROADWAY AND/OR A
 SUSPENDED PAVEMENT SYSTEM BE USED INSTEAD UNDER THE
 ENTRANCE ROADWAY?
  
 3. WHERE DO TRENCH DRAIN TD-1 AND YARD DRAIN YD-1 DRAIN
 TO?
  
 4. COORDINATE THE BUILDING/PERVIOUS/IMPERVIOUS AREAS ON
 THE LANDSCAPE PLANSE (SHEET L1.04) AND THE DRAINAGE
 CALCULATIONS. THE LANDSCAPE SHEET SHOWS A BUILDING AREA
 OF 19,381 S.F. (0.44 ACRES). THE DRAINAGE CALCULATIONS
 SHOW THE BUILDING AREA AS 0.30 ACRES.
  
 5. REPLACE DETAIL ST-8 WITH A PROJECT SPECIFIC DETAIL
 OF THE EXFILTRATION TRENCH SHOWING THE DIMENSIONS OF
 THE TRENCH, THE PIPE INVERT ELEVATION AND THE PIPE
 SIZE.
  
 6. THE DRAINAGE CALCULATIONS INDICATE A WEIR WILL NOT
 BE NEEDED. EXPLAIN HOW THE EXFILTRATION TRENCH WILL BE
 SURCHARGED TO THE ELEVATIONS ASSUMED IN THE
 EXFILTRATION TRECH CALCULATIONS WHEN THE WEST PIPE
 CONNECTED TO STRUCTURE ST-3 IS CONNECTED TO AN OFFSITE
 DRAINAGE SYSTEM.
  
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved