| Date |
Text |
| 2018-09-25 17:54:05 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | SEPTEMBER 13, 2018 SUBMITTAL PACKAGE: |
| | |
| | 1. NO DRAINAGE CALCULATIONS WERE PROVIDED FOR THE |
| | DESIGN OF THE EXFILTRATION TRENCH AND DRAINAGE VAULT. |
| | |
| | 2. SEVERAL TREES ARE PROPOSED NEAR OR OVER THE STORM |
| | PIPE. FOR EXAMPLE A GUMBO LIMBO IS PROPOSED OVER THE |
| | DRAINAGE VAULT AND NEAR STRUCTURE ST-3. |
| | |
| | 3. THE WALKWAYS FROM THE STREET TO THE BUILDING SLOPE |
| | TOWARD THE STREET. HOW IS THE RUNOFF FROM THE WALKWAYS |
| | DIRECTED TO THE ONSITE DRAINAGE SYSTEM. |
| | |
| | 4. THE FUNCTIONALITY OF THE EXFILTRATION TRENCH WILL BE |
| | AFFECTED BY THE BASEMENT WALLS. |
| | |
| | 5. CONFIRM THE SEPARATION BETWEEN THE FIRE MAIN LINE |
| | AND STORM PIPE ALONG THE NORTH SIDE OF THE FRONT |
| | ENTRANCE MEETS HEALTH DEPARTMENT PERMIT REQUIREMENTS. |
| | |
| | 6. TYPICAL SECTION D-D SHOULD INCLUDE A SWALE SIMILAR |
| | TO THE OTHER SECTIONS TO PREVENT DIRECT RUNOFF ONTO |
| | OFFSITE PROPERTIES. |
| | |
| | 7. PROVIDE A SECTION THROUGH THE ACACIA ROAD |
| | RIGHT-OF-WAY WHERE THE WALKWAY IS PROPOSED. |
| | |
| | 8. THE PUBLIC UTILITIES DEPARTMENT IS DEVELOPING TREE |
| | PLANTING GUIDELINES NEAR ITS UTILITIES. COORDINATE WITH |
| | EITHER THE PUBLIC UTILITIES DEPARTMENT OR THE CITY?S |
| | LANDSCAPE PLANNER. |
| | |
| | 9. SURVEY IS USING NAVD 1988 AS THE VERTICAL DATUM. THE |
| | CITY'S VERTICAL DATUM IS NGVD 1929. PROVIDE A COVERSION |
| | EQUATION BETWEEN THE TWO VERTICAL DATUMS ON THE SURVEY. |
| | |
| | 10. EXPLAIN HOW THE BASEMENTS WILL BE PROTECTED FROM |
| | FLOODING BY THE GROUNDWATER TABLE. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |