| Date |
Text |
| 2018-07-10 18:50:56 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | 1. LEFT OF THE SURVEY WAS CUTOFF ON SHEET G0.02. |
| | |
| | 2. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS |
| | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION |
| | EQUATION TO NGVD 1929 IS PROVIDED. |
| | |
| | 3. STORM PIPES IN FLAGLER R/W AND IN CURRIE CRESCENT |
| | R/W TO BE RELOCATED ONSITE. |
| | |
| | 4. REMOVE PROPOSED EXFILTRATION TRENCH FROM PUBLIC R/W. |
| | |
| | 5. USE ONLY RCP STORM PIPE IN THE PUBLIC R/W. |
| | |
| | 6. VERIFY THE HYDRAULIC GRADE LINE OF THE EXISTING |
| | DRAINAGE SYSTEM ON CURRIE CRESCENT WILL NOT BACKFLOW TO |
| | THE TRENCH DRAINS TD-2 AND TD-3. |
| | |
| | 7. DETERMINE THE IMPACT OF SEA LEVEL RISE ON THE |
| | DRAINAGE SYSTEM. |
| | |
| | 8. DRAINAGE SYSTEM TO PROVIDE WATER QUALITY TREATMENT |
| | IN ACCORDANCE WITH SFWMD CRITERIA. |
| | |
| | 9. OFFSITE DISCHARGE TO THE CITY?S INDIVIDUAL DRAINAGE |
| | SYSTEMS SHALL NOT EXCEED EXISTING PEAK DISCHARGE RATES. |
| | |
| | 10. VERIFY THE PROPOSED SWALE ALONG THE SOUTH PROPERTY |
| | LINE WILL FUNCTION WITH THE PROPOSED LANDSCAPE PLAN. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE MODIFIED SFWMD ERP APPROVAL |
| | PRIOR TO STARTING CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |
Print |