Plan Review Notes
Plan Review Notes For Project Z18060022
Project Number Z18060022
Review Stop STORM
Sequence Number 1
Notes
Date Text
2018-07-10 18:50:56THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. LEFT OF THE SURVEY WAS CUTOFF ON SHEET G0.02.
  
 2. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS
 ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION
 EQUATION TO NGVD 1929 IS PROVIDED.
  
 3. STORM PIPES IN FLAGLER R/W AND IN CURRIE CRESCENT
 R/W TO BE RELOCATED ONSITE.
  
 4. REMOVE PROPOSED EXFILTRATION TRENCH FROM PUBLIC R/W.
  
 5. USE ONLY RCP STORM PIPE IN THE PUBLIC R/W.
  
 6. VERIFY THE HYDRAULIC GRADE LINE OF THE EXISTING
 DRAINAGE SYSTEM ON CURRIE CRESCENT WILL NOT BACKFLOW TO
 THE TRENCH DRAINS TD-2 AND TD-3.
  
 7. DETERMINE THE IMPACT OF SEA LEVEL RISE ON THE
 DRAINAGE SYSTEM.
  
 8. DRAINAGE SYSTEM TO PROVIDE WATER QUALITY TREATMENT
 IN ACCORDANCE WITH SFWMD CRITERIA.
  
 9. OFFSITE DISCHARGE TO THE CITY?S INDIVIDUAL DRAINAGE
 SYSTEMS SHALL NOT EXCEED EXISTING PEAK DISCHARGE RATES.
  
 10. VERIFY THE PROPOSED SWALE ALONG THE SOUTH PROPERTY
 LINE WILL FUNCTION WITH THE PROPOSED LANDSCAPE PLAN.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE MODIFIED SFWMD ERP APPROVAL
 PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved