Plan Review Notes
Plan Review Notes For Project Z18050030
Project Number Z18050030
Review Stop STORM
Sequence Number 2
Notes
Date Text
2019-02-20 09:01:15THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 FEBRUARY 5, 2019 REVIEW PACKAGE:
  
 1. SHOW THE VERTICAL DATUM RELATIONSHIP BETWEEN NAVD
 1988 AND NGVD 1929 ON THE SURVEY (SHEET A.SI) [REPEAT
 COMMENT].
  
 2. ADD THE VERTICAL DATUM CONVERSION EQUATION TO NOTE 7
 ON SHEET C1.0.
  
 3. LABEL THE VERTICAL DATUM AND SHOW THE VERTICAL DATUM
 CONVERSION EQUATION ON EACH SHEET WITH ELEVATION DATA
 (SHEETS C2.1, C2.2, C3.1, C3.2, C4.1, C6.1).
  
 4. SURVEY (SHEET A.SI) IS NOT SIGNED AND SEALED.
  
 5. PROVIDE A CROSS SECTION FOR 8TH STREET SHOWING HOW
 THE VALET DROP OFF AREA WILL BE GRADED.
  
 6. SURVEY NOTE ON SHEET A.SI STATES THERE IS A LATER
 CERTIFIED SURVEY. PROVIDE A COPY OF THIS SURVEY.
 [REPEAT COMMENT]
  
 7. PROVIDE A CONDITION ASSESSMENT OF THE EXISTING
 DRAINAGE SYSTEM ON N. ROSEMARY AVE. [REPEAT COMMENT]
  
 8. NEED WHEEL STOP OR CURB FOR THE FOUR FULL DEPTH
 PARKING SPACES.
  
 9. HARDSCAPE WITHIN THE PUBLIC RIGHT OF WAY WILL
 REQUIRE MAINTENANCE AGREEMENT WITH THE CITY.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved