| Date |
Text |
| 2018-06-13 07:22:04 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY VERTICAL DATUM IS NGVD 1929. THE CITY HAS |
| | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION |
| | EQUATION TO NGVD 1929 IS PROVIDED. LABEL THE VERTICAL |
| | DATUM ON THE CONCEPTUAL PAVING, GRADING & DRAINAGE PLAN |
| | AND THE WATER & WASTEWATER PLAN. SHOW THE DATUM |
| | CONVERSION IF NAVD 1988 IS USED. SHOW THE DATUM |
| | CONVERSION ON THE SURVEY. |
| | |
| | 2. UPDATE THE FLOOD ZONE INFORMATION ON SHEET A.SI. |
| | FEMA ISSUED NEW FIRMS IN OCTOBER 2017. |
| | |
| | 3. ONSITE STORMWATER MANAGEMENT SYSTEM IS TO PROVIDE |
| | WATER QUALITY TREATMENT AND PEAK FLOW ATTENUATION PER |
| | SFWMD CRITERIA. |
| | |
| | 4. EXPLAIN HOW STORMWATER MANAGEMENT IS BEING PROVIDED |
| | IN THE PARCEL NORTH OF 8TH STREET. |
| | |
| | 5. IT APPEARS THE CURB IS BEING RELOCATED AT THE NE |
| | CORNER OF 8TH STREET AND N. ROSEMARY AVE. HOW WILL THIS |
| | AFFECT THE EXISTING ROADWAY DRAINAGE SYSTEM. |
| | |
| | 6. PROVIDE ADDITIONAL EXISTING GRADES ALONG N. ROSEMARY |
| | AVE AND HENRIETTA AVE. |
| | |
| | 7. SURVEY NOTE ON SHEET A.SI STATES THERE IS A LATER |
| | CERTIFIED SURVEY. PROVIDE A COPY OF THIS SURVEY. |
| | |
| | 8. PROVIDE A CONDITION ASSESSMENT OF THE EXISTING |
| | DRAINAGE SYSTEM ON N. ROSEMARY AVE. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE SFWMD ERP FOR THE DEVELOPMENT. |
| | |
| | 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |
Print |