2019-02-20 09:52:591. IS THE COMMUNITY GATED FROM PEDESTRIAN ACCESS TOO?
 IF SO, PLEASE SHOW THE WALL OR FENCE AROUND THE SITE
 PERIMETER IF PROPOSED.
 2. TRANSPORTATION DIVISION REQUESTS THAT THE PEDESTRIAN
 CONNECTION FROM EXECUTIVE CENTER DRIVE TO THE LAKE PATH
 REMAIN OPEN 24 HOURS A DAY AND ALLOWS PUBLIC ACCESS.
 3. INCLUDE PLAN SHEETS FOR BOTH FLOORS OF THE PARKING
 GARAGES
 4. INCLUDE THE PEDESTRIAN CONNECTION FROM EXECUTIVE
 CENTER DRIVE TO THE LAKE PATH IN THE PHOTOMETRIC
 ANALYSIS.
 5. COORDINATE WITH PALM TRAN FOR BUS SHELTER
 REQUIREMENTS. PROVIDE BUS SHELTER TO THE NEAREST BUS
 STOP ON EXECUTIVE CENTER OR RELOCATE THE EXISTING BUS
 STOP TO ACCOMMODATE A BUS SHELTER ALONG THE SITE
 FRONTAGE IF NECESSARY.
 6. PROVIDE EASEMENT FOR THE PORTION OF SIDEWALK AND
 PEDESTRIAN CONNECTION FROM EXECUTIVE CENTER DRIVE TO
 THE LAKE PATH WHICH ARE OUTSIDE PUBLIC RIGHT-OF-WAY OR
 EXISTING ACCESS EASEMENT.
 7. PLANNED DEVELOPMENT IS INTENDED TO CREATE A MORE
 DESIRABLE AND ATTRACTIVE DEVELOPMENT IN THE CITY, AND
 THE REQUEST FOR PARKING WAIVER SHALL CONFORM TO THE
 CONCEPTS OF NEW URBANISM. THE EXISTING PALMTRAN BUS
 ROUTE 49, WHILE MEETS THE BASIC TRAVEL NEEDS, DOES NOT
 PROVIDE DESIRABLE SERVICE DUE TO LONG HEADWAYS. PLEASE
 CONSTRUCT PROTECTED BIKE LANE ALONG EXECUTIVE CENTER
 DRIVE BETWEEN CONGRESS AVENUE AND THE SITE, WITH
 REDUCED TRAVEL LANE WIDTH OF 10 FEET AND GREEN BIKE
 LANES AT CONFLICT AREAS. THE PROTECTED BIKE LANES WILL
 PROVIDE A SAFE AND COMFORTABLE CONNECTION FOR RESIDENTS
 TO ACCESS, BY BICYCLE, ADDITIONAL TRANSIT OPTIONS AND
 THE PLANNED TROLLEY ON PALM BEACH LAKES BOULEVARD.
  
 SHING TSOI
 CITY IN-HOUSE TRAFFIC CONSULTANT