| Date |
Text |
| 2019-02-25 15:45:35 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 |
| | PROJECT: CLEAR LAKE ESTATES RESIDENTIAL Z18050029 |
| | FEBRUARY 21, 2019 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. SATISFIED. PROVIDE A TREE SURVEY, PROVIDE A PLAN |
| | WITH LOCATIONS OF EXISTING TREES, AND PROVIDE A TREE |
| | DISPOSITION CHART TO SHOW IF THEY WILL BE PRESERVED IN |
| | PLACE, RELOCATED OR REMOVED. |
| | TREE SURVEY NOT FOUND. |
| | CORRECTIONS TO TREE DISPOSITION PLAN ARE LISTED IN NEW |
| | COMMENTS. |
| | |
| | 2. SATISFIED. PROVIDE THE LANDSCAPE PLAN IN A MINIMUM |
| | SCALE OF 1:20. |
| | PLAN WAS SUBMITTED IN 1:30 SCALE AND IS STILL DIFFICULT |
| | TO DISCERN DETAILS. 1:20 WILL EXPAND THE NUMBER OF |
| | SHEETS BUT WILL BE EASIER TO READ DETAILS. |
| | |
| | 3. SATISFIED. PROVIDE THE AMOUNT OF PROVIDED OPEN SPACE |
| | AND LANDSCAPE AREA ON THE LANDSCAPE PLAN. |
| | |
| | 4. SATISFIED. SHOW THE CALCULATIONS FOR MINIMUM SHADE |
| | TREE AND FLOWERING TREE REQUIREMENTS PER SECTION |
| | 94-443(C)(2)B. AND ADD REQUIRED TREES PER UNIT TO |
| | ESTABLISH THE MINIMUM TREES REQUIRED FOR THE SITE. OPEN |
| | SPACE REQUIRED FOR RESIDENTIAL ZONING INCLUDES |
| | SETBACKS, PARKING, SIDEWALKS, LANDSCAPE ISLANDS AND |
| | BUILDING PERIMETER PLANTINGS. |
| | |
| | 5. SATISFIED. SUBSTITUTION OF PALMS REQUIRES 3:1 RATIO |
| | FOR COCONUT PALMS, REVISE ON CHART. PALMS SUBSTITUTION |
| | IS 102 NOT 132, REVISE ON CHART. |
| | PALMS ARE 3:1 OR 1:1. ADD UP ALL TRUNKS AT 3:1 AND THEN |
| | DIVIDE BY 3 TO GET TREE COUNT AND ADD 1:1 PALMS. IN MY |
| | REVIEW, THE COUNT CAME OUT TO PALMS SUBSTITUTED FOR 180 |
| | TREES. |
| | |
| | 6. SATISFIED. LIGUSTRUM DOES NOT QUALIFY AS A SHADE |
| | TREE. REVISE SHADE TREE COUNT. |
| | |
| | 7. SATISFIED. PROVIDE THE REQUIRED 5 FOOT LANDSCAPE |
| | BUFFER PLANTINGS ALONG THE EAST PROPERTY LINE ADJACENT |
| | TO THE LAKE WITH THE REQUIRED TREES OR NUMBER OF |
| | SUBSTITUTE PALMS PER CURRENT CODE REQUIREMENTS OF |
| | SECTION 94-443(D). |
| | |
| | 8. SATISFIED. PLEASE INCLUDE ALL CALCULATIONS FOR THE |
| | EAST BUFFER AND NORTH BUFFER SEGMENTS ADJACENT TO THE |
| | ENTRANCE ON THE PERIMETER BUFFER REQUIREMENT CHART SO |
| | THAT LINEAR FOOTAGE OF ALL PROPERTY LINE SEGMENTS ARE |
| | INCLUDED. |
| | BUFFER SEGMENT ADJACENT TO THE ROAD NEEDS TO BE LISTED |
| | SEPARATELY, AS THIS HAS A REQUIRED 10 FOOT BUFFER, |
| | DIFFERENT FROM THE 5 FOOT REQUIRED BUFFER ON ALL OTHER |
| | SEGMENTS AND NEEDS TO INCLUDE REQUIRED TREES. |
| | |
| | 9. SATISFIED. PLEASE PROVIDE THE TREE AS REQUIRED IN |
| | THE TERMINAL LANDSCAPE ISLAND AT THE ENDS OF THE ROWS |
| | OF PARKING SPACES ADJACENT TO THE ENTRANCE TO BUILDING |
| | 4. |
| | TERMINAL ISLAND TREE IS REQUIRED AT THE SOUTH SIDE OF |
| | THE BUILDING, CANNOT BE DISPLACED BY A FIRE HYDRANT. |
| | |
| | 10. SATISFIED. PLEASE CORRECT THE FLORIDA FRIENDLY |
| | LANDSCAPE CHART SO THAT TREES AND SHRUBS ARE NOT |
| | COUNTED TWICE FOR EACH CATEGORY OF NATIVE AND DROUGHT |
| | TOLERANT, AND CORRECT THE POINTS AWARDED FOR MULCH TO |
| | 5. PROVIDE THE MINIMUM 50 POINTS. |
| | |
| | 11. SATISFIED. PLEASE PROVIDE LOCATIONS OF LIGHTING ON |
| | THE LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. |
| | |
| | 12. SATISFIED. PLEASE SHOW LOCATIONS OF WATER AND SEWER |
| | LINES ON THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH |
| | LANDSCAPING. |
| | THERE APPEAR TO BE CONFLICTS IN MULTIPLE LOCATIONS. |
| | EXPLAIN HOW THE 12 FOOT UTILITY EASEMENT ALONG THE WEST |
| | AND SOUTH PROPERTY LINE WILL ALLOW THE PLANTING OF |
| | BUFFER TREES AS PROPOSED. |
| | 13. SATISFIED. PROVIDE LOCATIONS AND SCREENING FOR ALL |
| | ABOVE GROUND UTILITY VALVES, BACKFLOW PREVENTERS, A/C |
| | UNITS, ETC. |
| | HEDGE SCREENING NOT SHOWN FOR BACKFLOWS AND VALVES, FPL |
| | TRANSFORMER LOCATIONS NOT SHOWN. |
| | |
| | 14. SATISFIED. SHOW LOCATIONS OF ANY ROOT BARRIERS |
| | REQUIRED TO PROTECT UTILITY LINES. |
| | SOME ROOT BARRIER LOCATIONS ARE SHOWN, BUT OTHERS |
| | APPEAR TO REQUIRE ROOT BARRIER DUE TO PROXIMITY. |
| | |
| | 15. SATISFIED. PLEASE SHOW CALCULATIONS FOR EACH |
| | RESIDENTIAL BUILDING FOR COMPLIANCE WITH 40 PERCENT |
| | PERIMETER LANDSCAPE PER SECTION 94-443(E), AND 30 |
| | PERCENT REQUIREMENT FOR THE PARKING DECK. |
| | |
| | 16. SATISFIED. PLEASE SHOW COMPLIANCE WITH SECTION |
| | 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF |
| | PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT |
| | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE |
| | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH |
| | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH |
| | FLORIDA LANDSCAPES. |
| | ADDITIONAL COMMENTS 12/14/18: |
| | 17. SATISFIED. THE FOLLOWING CORRECTIONS NEED TO BE |
| | MADE TO THE TREE DISPOSITION PLAN: |
| | ? 1:1 REPLACEMENT FOR SABAL PALMS IS CATEGORY 3 AT 100 |
| | SQ FT. FOR EACH PALM TRUNK. |
| | ? #21 FICUS IS CATEGORY 1 AT 300 SQ FT. |
| | ? STAFF REVIEW OF CHART SHOWS TOTAL MITIGATION DUE IS |
| | 9130 SQ FT. |
| | ? GIVE THE CONDITION OF SEAGRAPE TREE #31, AS ALL |
| | NATIVE TREES IN GOOD CONDITION MUST BE PRESERVED OR |
| | RELOCATED. |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| |
Print |