Plan Review Notes
Plan Review Notes For Project Z18050029
Project Number Z18050029
Review Stop Z
Sequence Number 1
Notes
Date Text
2018-06-13 12:09:39PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 06.13.2018
 PROJECT NO.: Z18050029
 CASE NO.: PB 1242G
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING
 REVIEW COMMENTS:
  
 1. AN UPDATED TRAFFIC CONCURRENCY APPROVAL SHALL BE
 PROVIDED FROM PALM BEACH COUNTY.
  
 2. AN APPROVED SCHOOL CAPACITY AVAILABILITY
 DETERMINATION SHALL BE PROVIDED FROM THE SCHOOL
 DISTRICT OF PALM BEACH COUNTY.
  
 3. AS CURRENTLY WRITTEN, THE JUSTIFICATION FOR THE
 PARKING WAIVER DOES NOT MEET THE REQUIRED MINIMUM
 NUMBER OF STANDARDS.
  
 4. ALL OUTSTANDING PUBLIC UTILITY LETTERS SHALL BE
 PROVIDED.
  
 5. IT IS RECOMMENDED THAT ANY PARKING ROWS FRONTING
 ONTO A LANDSCAPE BUFFER/AREA BE REDUCED TO 16 FEET IN
 LENGTH, ALLOWING FOR 2 FEET OF OVERHANG INTO THE
 LANDSCAPE AREA. THIS REDUCES THE AMOUNT OF IMPERVIOUS
 AREA, THE NEED FOR WHEEL STOPS, ETC. NOTE THAT THE
 OVERHANG CANNOT EXTEND INTO THE MINIMUM REQUIRED BUFFER
 WIDTH.
  
 6. PLEASE EXPLAIN THE LOCATION OF THE PARKING GARAGE
 AND THE NEED FOR THE SETBACK WAIVER, GIVEN THE SIZE OF
 THE PROPERTY AND ALTERNATIVE LOCATIONS AVAILABLE.
  
 7. THE DEVELOPER WILL BE RESPONSIBLE FOR THE
 CONSTRUCTION OF THAT PORTION OF THE LAKE PATH THAT IS
 IMMEDIATELY ADJACENT TO THE PROPOSED DEVELOPMENT. STAFF
 WILL BE DEVELOPING LANGUAGE REGARDING THE TIMING,
 OBLIGATIONS, ETC. AS WELL AS A CROSS SECTION OF THE
 REQUIRED DESIGN.
  
 8. A DIRECT, OPEN AND PUBLIC PEDESTRIAN CONNECTION
 SHALL BE PROVIDED FROM EXECUTIVE CENTER DRIVE TO THE
 LAKE PATH. THE CONNECTION SHALL REMAIN UNLOCKED AND
 OPEN TO THE GENERAL PUBLIC FROM DAWN UNTIL DUSK.
  
 9. PLEASE PROVIDE JUSTIFICATION AS TO HOW THE PROPOSED
 DEVELOPMENT MEETS THAT ZONING AND LAND DEVELOPMENT
 REGULATIONS REQUIREMENT THAT PLANNED DEVELOPMENTS
 IMPLEMENT ?INNOVATIVE LAND PLANNING AND DEVELOPMENT
 TECHNIQUES TO CREATE A MORE DESIRABLE AND ATTRACTIVE
 DEVELOPMENT.? IT IS STRONGLY ENCOURAGED THAT THE
 APPLICANT COORDINATE A STAND-ALONE MEETING WITH STAFF
 TO DISCUSS THE PROPOSED DESIGN OF THE SITE, AS THERE
 ARE SEVERAL CONCERNS.
  
 10. AS IT APPEARS STRUCTURAL ELEMENTS OF THE BUILDINGS
 ARE ENCROACHING INTO THE REQUIRED SIDE AND REAR
 SETBACKS, PLEASE PROVIDE THE DIMENSIONS OF SUCH
 ENCROACHMENT. PURSUANT TO SEC. 94-305, SUCH ELEMENTS
 SHALL NOT EXTEND MORE THAN THREE (3) FEET INTO THE
 REQUIRED SETBACK.
  
 11. PHOTOMETRIC LEVELS SHALL BE PROVIDED AT ALL
 PROPERTY LINES AND SHALL NOT EXCEED 0.5 FOOTCANDLES.
  
 12. SITE PLAN SHALL IDENTIFY THE NUMBER OF BICYCLE
 PARKING SPACES REQUIRED/PROVIDED; ONE (1) BICYCLE SPACE
 SHALL BE PROVIDED FOR EVERY 20 VEHICULAR PARKING
 SPACES.
  
 13. A UNITY OF TITLE WILL BE REQUIRED PRIOR TO THE
 ISSUANCE OF ANY BUILDING PERMITS.
 ___________________________________________
  
 PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING:
  
 A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
  
 B) 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE
 PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X
 17IN), AND AN ELECTRONIC COPY OF ALL PLANS.
  
 C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
  
 D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
  
 E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE.
  
 F) IN ORDER TO BE CONSIDERED FOR THE AUGUST 21, 2018,
 PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE
 SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED
 DOCUMENTS/PLANS NO LATER THAN FRIDAY, JUNE 29, 2018.
  
 G) TO BE PLACED ON THE AUGUST 21, 2018, PLANNING BOARD
 AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO LATER
 THAN AUGUST 6, 2018. SIGNAGE SHALL CONFORM AND BE
 INSTALLED WITH THE REQUIREMENTS OF THE CITY?S ZONING
 AND LAND DEVELOPMENT REGULATIONS, AS ALSO PROVIDED IN
 THE DEVELOPMENT APPLICATION. A SIGNED AND NOTARIZED
 AFFIDAVIT SHALL BE PROVIDED BY THE DEADLINE REFERENCED
 ABOVE.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved