Date Text
2018-06-13 07:20:16THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. UPDATE THE FLOOD ZONE INFORMATION ON THE BOUNDARY
 SURVEY. NEW FIRMS WERE ISSUED IN OCTOBER 2017.
  
 2. THE CITY VERTICAL DATUM IS NGVD 1929. LABEL THE
 VERTICAL DATUM ON THE CONCEPTUAL PAVING, DRAINAGE,
 PLAN. SHOW THE DATUM CONVERSION TO NGVD1929 IF NGVD1929
 IS NOT USED. NOTE THE OCTOBER 20, 2015 BOUNDARY SURVEY
 USES NGVD1929.
  
 3. SHOW THE DATUM CONVERSION TO NGVD1929 ON THE
 CONCEPTUAL WATER AND WASTEWATER PLAN.
  
 4. OUTFALL CULVERT CONNECTION TO EXISTING CATCH BASIN
 IS NEAR AN EXISTING 10-INCH WATER MAIN.
  
 5. CONSIDER REDUCING THE LENGTH OF THE PARKING SPACES
 AND PROVIDE TWO FEET OF OVERHANG IN THE LANDSCAPE
 AREAS. THIS WILL REDUCE THE AMOUNT OF ASPHALT AND
 INCREASE THE PERVIOUS AREA.
  
 6. CONSIDER INCORPORATING LOW IMPACT DESIGN (LID) FOR
 THE PROJECT.
  
 7. CONSIDER ADDING STORMWATER DETENTION AREAS IN THE
 LARGE LANDSCAPE AREAS SUCH AS TO THE NE OF THE ENTRANCE
 ROAD, WEST OF THE ROUNDABOUT OR BETWEEN/BEHIND THE
 BUILDINGS 2 AND 3.
  
 8. SHOW AND LABEL UTILITIES ON THE LANDSCAPE PLANS.
  
 9. DIRECT ROOFING GUTTER DOWN SPOUTS TO PERVIOUS AREAS
 IF POSSIBLE. OTHERWISE ATTEMPT TO CONNECT DIRECTLY TO
 THE DRAINAGE SYSTEM INSTEAD OF DISCHARGING TO
 IMPERVIOUS AREAS.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. PROVIDE SFWMD ERP FOR THE DEVELOPMENT.
  
 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved