| 2018-11-09 16:22:41 | THE FOLLOWING COMMENTS ARE FROM THE OCTOBER 11, 2018 | | | SUBMITTAL PACKAGE: | | | | | | 1. COORDINATE THE STORM PIPE SIZE SHOWN ON THE SHEET | | | C1.1 CONCEPTUAL PG&D PLAN (12" HDPE) WITH THE ON-SITE | | | EXFILTRATION TRENCH DETAIL (18" HDPE) AMD POLLUTION | | | REDTARDANT BAFFLE (PRB) DETAIL (18" HDPE) ON SHEET C2.1 | | | CONCEPTUAL ENGINEERING DETAILS. | | | | | | 2. THE MILL AND OVERLAY LIMITS ON MALVERNE ROAD MAY | | | NEED TO BE EXPANDED INTO THE EASTBOUND LANE DEPENDING | | | ON THE TRENCH CUT NEEDED TO INSTALL THE SANITARY WYE. | | | | | | 3. CONSIDER MOVING THE CLEANOUTS OUT OF THE SIDEWALK TO | | | ELIMINATE A TRIPPING HAZARD. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |