| 2018-06-13 07:17:24 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY VERTICAL DATUM IS NGVD 1929. LABEL THE |
| | VERTICAL DATUM ON THE GRADING PLAN. SHOW THE DATUM |
| | CONVERSION TO NGVD1929 IF NGVD1929 IS NOT USED. |
| | |
| | 2. THE SFWMD ERP SHOWS THE MINIMUM BUILDING FINISHED |
| | FLOOR ELEVATION AS 15.7 FEET NGVD FOR THIS AREA OF THE |
| | ZOO. |
| | |
| | 3. GRADING PLAN ELEVATIONS INDICATE THE GROUND SLOPE IS |
| | STEEPER THAN 3:1 ON THE NORTH SIDE OF THE PROPOSED |
| | BUILDING. SLOPES STEEPER THAN 4:1 ARE DIFFICULT TO |
| | MAINTAIN (MOWING OPERATIONS). |
| | |
| | 4. CONSIDER ALTERNATE BMP FOR HAY BALES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE SFWMD ERP MODIFICATION FOR THE DEVELOPMENT. |
| | |
| | 3. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |