Plan Review Notes
Plan Review Notes For Project Z18040013
Project Number Z18040013
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2018-05-09 11:17:22PLEASE RESPOND TO COMMENTS IN WRITING:
  
 1. PROPOSED DRIVEWAY APRON SHALL BE PER CITY OF WPB
 STANDARD
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 2. CONDITION OF APPROVAL - TO REMOVE EXISTING DRIVEWAY
 APRON AND RESTORE SIDEWALK WHERE NOT NEEDED.
 THIS WILL REQUIRE CONTRACTOR TO OBTAIN A RIGHT-OF-WAY
 PERMIT.
  
 3. METER AND METER BOX TO BE LOCATED JUST BEHIND THE
 SIDEWALK IN EASEMENT. (5'X5' EASEMENT)
  
 4. SHOW SANITARY SEWER SERVICE LINE WITH CLEAN/OUT.
  
 5. SHOW POWER POLE LOCATION ON ALL PLANS. (POWER POLE
 LOCATED SW CORNER OF SITE ON SIDEWALK)
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
  
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved