| 2020-01-13 10:04:31 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | JANUARY 2, 2020 SUBMITTAL PACKAGE: |
| | |
| | 1. CCTV REPORT OF THE STORMWATER SYSTEMS RECEIVED LAST |
| | WEEK. MAP SHOWING STRUCTURE NUMBERS RECEIVED ON |
| | 1/13/2020. THE CCTV VIDEOS HAVE NOT BEEN SUBMITTED. |
| | |
| | 2. LOCATE STRUCTURE S-202 TO AVOID MODIFYING ADJACENT |
| | DRIVEWAY. STRUCTURE WILL NEED TO BE LOCATED AT EDGE OF |
| | PAVEMENT INSTEAD OF AT SIDEWALK, PERHAPS FURTHER WEST. |
| | |
| | 3. PIPE BETWEEN S-202 AND S-203 IS LOCATED OUTSIDE THE |
| | RIGHT OF WAY AND ON PRIVATE PROPERTY. |
| | |
| | 4. PROVIDE CONDITION ASSESSMENT OF THE INLET ON |
| | FLAMINGO DRIVE THAT WILL BE MODIFIED FOR THIS PROJECT. |
| | |
| | 5. MOVE THE WEIR FROM CS-1 TO S-103. |
| | |
| | 6. CONSIDER SLOPING THE PIPE BETWEEN S-101 AND S-102. |
| | |
| | 7. WHAT IMPACT WILL THE PROPOSED DRAINAGE SYSTEM ON |
| | BISCAYNE DRIVE HAVE ON THE EXISTING FICUS/BANYAN TREES? |
| | |
| | 8. THE STREET LIGHT ON BISCAYNE DRIVE IS LOCATED IN THE |
| | PORTION OF THE RIGHT-OF-WAY TO BE ABANDONED. |
| | |
| | 9. SHOW EASEMENT FOR NEW STORM PIPE CROSSING PROPERTY |
| | SOUTH OF BISCAYNE DRIVE RIGHT-OF-WAY. |
| | |
| | 10. PROVIDE VERTICAL CLEARANCE INFORMATION BETWEEN THE |
| | PIPE BETWEEN S-201 AND S-202 AND THE EXISTING SEWER AND |
| | WATER MAINS. |
| | |
| | 11. PROVIDE TOPOGRAPHIC SURVEY OF BISCAYNE DRIVE |
| | RIGHT-OF-WAY FOR ABOUT 100 FEET WEST OF THE PROPOSED |
| | ABANDONMENT LINE. LOCATE ABOVE GROUND IMPROVEMENTS AND |
| | SPOT GRADES AT LOW/HIGHT POINTS AND GRADE BREAKS. |
| | |
| | 12. PROVIDE CONCRETE SIDEWALK, CONCRETE APRON AND DROP |
| | CURB FOR THE DRIVEWAY TO FLAMINGO DRIVE. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | [email protected] |
| | 561-494-1120 |
| |