| 2020-01-09 11:42:38 | PASSED WITH PROVISOS: |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL , PLANS SHALL SHOW |
| | PROPOSED LOCATIONS AND DIMENSIONS OF ALL WATER, |
| | STORMWATER, AND SANITARY AND SEWER LINES, INCLUDING |
| | STUBS TO EACH PROPERTY LINE FOR WATER AND SANITARY |
| | SEWERS, THE MAKE AND MODEL OF ALL VALVES, METERS, AND |
| | OTHERS DEVICES TO BE INSTALLED ON THE SYSTEM, CATCH |
| | BASINS, CULVERTS, DITCHES INCLUDING GRADES, PIPES |
| | SIZES, MATERIALS, ELEVATIONS, ASSUMPTIONS, |
| | CALCULATIONS, INVERT ELEVATIONS FOR ALL INLETS AND |
| | MANHOLES AND PROFILES OF SANITARY SEWER LINES. ALL |
| | AVAILABLE ELEVATION SHALL BE SHOWN ON THE PROFILE VIEW. |
| | DIRECTION OF FLOW SHALL BE SHOWN ON PLAN VIEW ON PLAN |
| | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| | FACILITIES LOCATED ON THE RIGHT-OF-WAY. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, ADD FIRE FLOWS TO |
| | WATER DEMANDS CHART. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, CUT AND CAP UTILITIES |
| | NOT IN USE, AND REMOVE ANY ABANDONED UTILITY LINES |
| | LARGER THAN 2 INCHES FROM CITY RIGHT OF WAY. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE DEDICATED |
| | UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY PERSONNEL TO |
| | PROPOSED UTILITY WATER METERS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE |
| | ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER |
| | METER AND BACKFLOW PREVENTION. COORDINATE WITH MARK |
| | HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH CITY OF |
| | WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF BACKFLOW |
| | DEVICES AND WATER METERS. CONTACT HIM AT 561-494-2262 |
| | OR [email protected] |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT |
| | DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW |
| | PREVENTER AS DCDA. SPECIFY LEAD FREE DESIGN ON ALL |
| | BACKFLOWS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES OF |
| | WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING |
| | APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT |
| | SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING |
| | SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED |
| | LEAD-FREE DESIGN. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD |
| | RIGHT OF WAY. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY |
| | ELEVATIONS AT MANHOLE TIE-IN. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES ARE |
| | PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY LATERAL |
| | LOCATIONS AND SHOW ADDRESSES OF ADJACENT PARCELS. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES ARE |
| | BEING REPLACED IN ROW, SHOW ADJACENT PARCEL ADDRESSES. |
| | |
| | FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN IN |
| | CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50 |
| | FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF |
| | PROPOSED TRENCH PER CITY OF WPB STANDARD DETAIL GC-9. |
| | |
| | PLEASE RESPOND TO ALL COMMENTS IN WRITING. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO, PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | DIRECT: (561) 494-1098 [email protected] |
| | |
| |