| 2018-03-09 13:52:30 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. NEW FEMA FIRM MAPS AND TWO FEET OF FREEBOARD ABOVE |
| | BASE FLOOD ELEVATION FOR STRUCTURES IN SPECIAL FLOOD |
| | HAZARD AREA ARE NOW IN EFFECT. THE MAPS ARE AVAILABLE |
| | AT HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX? |
| | |
| | 2. UPDATE THE FLOOD ZONE INFORMATION ON THE SURVEY. |
| | |
| | 3. ON SHEET 2 OF 13 OF THE ENGINEERING PLANS: |
| | A. LABEL THE PIPELINE IN THE LWDD PROPERTY. |
| | |
| | B. RENAME EX-CB AS EX-MH |
| | |
| | C. INDICATE WHERE THE PARKING LOT BETWEEN THE |
| | RESTAURANT BUILDINGS DRAINS TO |
| | |
| | D. INDICATE WHERE THE WEST END OF THE NORTH PARKING LOT |
| | DRAINS TO |
| | |
| | E. REVIEW THE PERIMETER BERM ELEVATION (E.G. PEAK |
| | 25-YEAR 3-DAY STAGE) SHOWN ON THE PLANS. THIS ELEVATION |
| | IS LOWER THAN ALL OF THE PROPOSED GRADES. |
| | |
| | 4. TYPICAL SECTION FOR THE PARKING LOT SHOWS ALL OF THE |
| | PAVEMENT DRAINING TO ONE SIDE. HOW WILL THE WATER GET |
| | PAST THE LANDSCAPE ISLANDS? |
| | |
| | 5. CONSIDER REDUCING THE PARKING SPACE DEPTH BY |
| | INCLUDING A 2? GRASS OVERHANG. THE CURB WOULD FUNCTION |
| | AS WHEEL STOPS. COORDINATE WITH THE PLANNING DEPT. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE SFWMD ERP FOR THE DEVELOPMENT. |
| | |
| | 3. PROVIDE LWDD PERMIT FOR THE PROJECT. |
| | |
| | 4. PROVIDE LETTER FROM LWDD APPROVING THE PROPOSED |
| | IMPROVEMENTS ON THEIR PROPERTY. |
| | |
| | 5. INDICATE WHERE THE CONTROL STRUCTURE IS FOR THE |
| | ONSITE DRAINAGE SYSTEM. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |