| Plan Review Notes For Project Z18020021 |
| Project Number |
Z18020021 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2018-03-14 12:49:30 | #1 PROVIDE ESTIMATED FLOWS GPD FOR EACH BUILDING. | | | | | | #2 BACKFLOW (RPPA AND DCDA) LOCATIONS MUST BE PRE | | | APPROVED BY FIRE AND UTILITY CUSTOMER SERVICE FOR EACH | | | BUILDING. | | | | | | #3 PROVIDE TIMELINE AS TO WATERMAIN UPGRADE TO 12" WM. | | | | | | #4 PROVIDE PRELIMINARY SUMMARY AS TO THE EXISTING SEWER | | | CAPACITY WITH CITY OF WPB PUBLIC UTILTIES. | | | | | | MANNY GONZALEZ | | | SENIOR ENGINEERING PROJECT COORDINATOR | | | PUBLIC WORKS DEPARTMENT | | | 401 CLEMATIS STREET, 4TH FLOOR | | | WEST PALM BEACH, FL 33401 | | | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) | | | MAIN PHONE: (561) 822-1200 | | | DIRECT: (561) 494-1085 | | | FAX: (561) 494-1116 | | | EMAIL: [email protected] | | | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS | | | /FORMS,-PERMITS-APPLICATIONS | | | | | | IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF | | | WEST PALM BEACH | | | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, | | | MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD | | | FREE." | | | FOR MORE INFORMATION REFER TO THE LINK BELOW: | | | HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI | | | CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL | | | |
| |
Print |
|