| Plan Review Notes For Project Z18020020 |
| Project Number |
Z18020020 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2018-05-10 17:06:02 | COMMENTS BELOW ARE FROM THE REVIEW OF THE APRIL 25, | | | 2018 SUBMITTAL PACKAGE. | | | | | | 1. THOUGH NOT REQUIRED, SUGGESTION IS MADE TO INCLUDE | | | POLLUTANT RETARDANT BAFFLES (PRB'S) IN FRONT OF THE | | | EXFILTRATION TRENCHES TO PROLONG THE EFFECTIVENESS OF | | | THE EXFILTRATION TRENCH. THE SUMP IN THE CATCH BASINS | | | SHOULD BE INCREASED TO 18 INCHES OR 24 INCHES FROM 12 | | | INCHES IF PRB'S ARE INTALLED. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |