| Date |
Text |
| 2018-06-28 16:41:15 | 1. SATISFIED |
| | 2. ONGOING. |
| | 3. PARTIALLY SATISFIED. PLEASE SUBMIT A CLEAR COPY OF |
| | THE SURVEY PRIOR TO PERMIT PLAN SUBMITTAL. |
| | 4. SATISFIED. |
| | 5. SATISFIED. |
| | 6. SATISFIED. |
| | 7. NOT SATISFIED. PLEASE CONSIDER THE USE OF ADDITIONAL |
| | WINDOWS ON THE ACTIVE USE (STAIRWELL) AREA FACING SOUTH |
| | TO COMPLY WITH THE 15% FENESTRATION REQUIREMENT. PLEASE |
| | PROVIDE MORE DETAILS ON ARCHITECTURAL TREATMENT FOR THE |
| | GARAGE INCLUDING THE TRANSPARENCY SEPARATION BETWEEN |
| | THE HORIZONTAL ELEMENTS TO ENSURE SUFFICIENT SCREENING |
| | ON THE PARKING GARAGE. |
| | THE PROVIDED SEPARATION BETWEEN THE HORIZONTAL ELEMENTS |
| | WILL NOT PROVIDE SUFFICIENT SCREENING OF THE PARKING |
| | GARAGE. THE OPPORTUNITIES FOR ENHANCED SCREENING WILL |
| | BE EVALUATED AT TIME OF PERMIT. |
| | 8. NOT SATISFIED. |
| | PLEASE INCLUDE REQUIRED AND PROVIDED BIKE PARKING IN |
| | THE PARKING DATA. |
| | 9. NOT SATISFIED. |
| | THE PROPOSED BICYCLE RACK IS NOT AN ACCEPTABLE RACK |
| | TYPE IN THE CITY. STAFF WILL PROVIDE DETAIL OF ACCEPTED |
| | BICYCLE RACK TYPES. PLEASE SHOW DETAIL OF THE BIKE |
| | RACK, INCLUDING SPECIFICATIONS OF THE RACK AND SPACING. |
| | PLEASE INCLUDE REQUIRED AND PROVIDED BIKE PARKING IN |
| | PARKING DATA. |
| | 10. SATISFIED. |
| | 11. SATISFIED. |
| | 12. SATISFIED. |
| | 13. SATISFIED. |
| | 14. ACKNOWLEDGED. |
| | 15. NOT SATISFIED. |
| | PHOTOMETRICS WILL BE EVALUATED AT TIME OF BUILDING |
| | PERMIT. PLEASE PROVIDE REQUIRED PHOTOMETRICS ALONG ALL |
| | STREET FRONTAGES. |
| | 16. SATISFIED. |
| | 17. SATISFIED. |
| | 18. CONDITIONALLY SATISFIED. |
| | NEW COMMENTS: |
| | 1. PER SECTION 94-113(D), SIDEWALKS, A SIDEWALK WITH A |
| | MINIMUM OF EIGHT FEET CLEAR WIDTH SHALL BE PROVIDED |
| | ALONG THE BUILDING FRONTAGE. PLEASE REVISE ACCORDINGLY. |
| | 2. THE PARKING GARAGE ENTRANCE/EXIT IS WIDER THAN THE |
| | RECOMMENDED 20?. PLEASE REVISE. |
| | 3. PLEASE PROVIDE A PEDESTRIAN CROSSING FROM THE |
| | SIDEWALK ALONG PALM BEACH LAKES BOULEVARD ACROSS THE |
| | PORTE COCHERE AREA TO THE SIDEWALK IN FRONT OF THE |
| | PROJECTS MAIN ENTRANCE. |
| | 4. PLEASE REVISE FROM PALMS ALONG THE BUILDING?S ENTRY |
| | DRIVEWAY TO A DIFFERENT TREE SPECIES. |
| | 5. A BACK-UP SPACE IS REQUIRED FOR DEAD-END AISLES |
| | WITHIN THE PARKING GARAGE. |
| | |
| |
Print |