Plan Review Notes
Plan Review Notes For Project Z17120025
Project Number Z17120025
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2018-04-03 14:58:111701 CLARE COMPREHENSIVE PLAN TRAFFIC ANALYSIS (DATED
 MARCH 2, 2018) COMMENTS:
 - TABLES 1A AND 1B INCORRECTLY LABELED SQUARE-FOOTAGE
 AS DWELLING UNIT FOR THE INDUSTRIAL LAND USE. PLEASE
 REVISE.
 - PROVIDE APPROVAL LETTER FROM PALM BEACH COUNTY ON
 TRAFFIC ANALYSIS
 1701 CLARE SITE-SPECIFIC TRAFFIC ANALYSIS (DATED MARCH
 2, 2018) COMMENTS:
 - REPORT CRITICAL MOVEMENT (NOT APPROACH) DELAY AND LOS
 FOR THE TWO-WAY STOP-CONTROLLED INTERSECTIONS.
 - PROVIDE MITIGATION MEASURES FOR INTERSECTIONS WHICH
 FAIL TO MEET THE LOS REQUIREMENTS (LOS E ON CITY
 THOROUGHFARE STREETS AND LOS D FOR OTHER STREETS). PER
 CITY?S COMP PLAN, PLEASE IDENTIFY TRANSPORTATION SYSTEM
 MANAGEMENT (TSM) AND TRANSPORTATION DEMAND MANAGEMENT
 (TDM) MEASURES AS MITIGATION, OR PROVIDE PROPORTIONATE
 SHARE CONTRIBUTION TOWARDS CITY?S TSM, TDM OR
 MULTI-MODEL IMPROVEMENTS.
 - THE INTERSECTION VOLUME DEVELOPMENT WORKSHEET IS NOT
 CONSISTENT WITH THE TRIP ASSIGNMENT. PLEASE REVISE. IT
 APPEARS THAT THE TRIP ASSIGNMENT WAS UPDATED IN FIGURE
 2 BUT NOT THE TRIP ASSIGNMENT IN THE INTERSECTION
 VOLUME DEVELOPMENT WORKSHEET.
 - THE INTERSECTION VOLUME DEVELOPMENT WORKSHEET DOES
 NOT TAKE INTO ACCOUNT THE PASS-BY TRIPS. PASS-BY TRIPS
 SHOULD BE SHOWN AS DIVERTING FROM THE MAJOR STREETS
 INTO THE SITE.
 - THE ATTACHMENT FOR PEAK SEASON FACTOR REPORT IS FOR
 I-95. PLEASE ATTACH THE CORRECT PEAK SEASON FACTOR
 REPORT FOR THE STUDY AREA.
 - THE LANE CONFIGURATION FOR THE PARKER AVENUE/CAROLINE
 STREET ANALYSIS IS INCORRECT. PARKER AVENUE HAS ONLY
 ONE THROUGH LANE IN EACH DIRECTION AT THAT LOCATION.
 - INFORMATION ON COMMITTED DEVELOPMENT IN THE CITY WILL
 BE PROVIDED.
 - PROVIDE THE APPROVAL LETTER FROM PALM BEACH COUNTY ON
 TRAFFIC CONCURRENCY
 PARKING REQUIREMENT EVALUATION (DATED MARCH 2, 2018)
 COMMENTS:
 - THE CITED NUMBER OF PARKING SPACES IN THE PARKING
 STUDY IS NOT CONSISTENT WITH THE SITE PLAN. PLEASE
 REVISE.
 - WITH THE REDUCED PARKING SPACES, AND 65% OF THE TRIPS
 ASSIGNED TO CLARE AVENUE AND 35% TO CAROLINE STREET,
 ACCESS TO TRANSIT AND REGIONAL PEDESTRIAN/BICYCLE
 NETWORK BECOMES CRITICAL IN ENCOURAGING ALTERNATE MODES
 OF TRANSPORTATION, AND DECREASING VEHICULAR DEMAND AND
 PARKING NEEDS. PLEASE PROVIDE THE FOLLOWING
 TRANSPORTATION DEMAND MANAGEMENT (TDM) MEASURES AND
 PROVIDE PEDESTRIAN AND BICYCLE CONNECTIVITY TO PARKER
 AVENUE:
 O PROVIDE SIDEWALK AND ACCESSIBLE PATHWAY TO PARKER
 AVENUE VIA CAROLINE STREET, COORDINATE WITH PALM TRAN
 TO RELOCATE THE BUS STOP ON PARKER AVENUE SOUTH OF
 CAROLINE STREET TO NEAR HOWARD PARK
 O PROVIDE SHUTTLE SERVICES TO RESIDENTS AND EMPLOYEES
 TO/FROM NEARBY TRANSIT STATIONS
 O PROVIDE EMPLOYEE TRANSPORTATION BENEFITS FOR
 ALTERNATE MODES OF TRANSPORTATION
 O PROVIDE OPTION FOR NEW RESIDENTS TO PURCHASE
 DISCOUNTED TRI-RAIL AND PALM TRAN TRANSIT PASSES FOR AT
 LEAST 1 YEAR
 O PROVIDE CAR SHARING AND BIKE SHARING FACILITIES AND
 SERVICES
 O DEDICATE PARKING SPACES FOR CARPOOLS
 O IMPLEMENT PARKING MANAGEMENT AND PRICING STRATEGIES
 FOR RESIDENT PARKING
 O OTHER TDM MEASURES AS APPROPRIATE.
 SITE PLAN (RECEIVED ON MARCH 5, 2018) COMMENTS:
 - THE SUBMITTAL DOES NOT INCLUDE RESPONSES TO THE SITE
 PLAN AND PEDESTRIAN CIRCULATION COMMENTS FROM TRAFFIC.
 - A SIGNING AND PAVEMENT MARKING PLAN, PREPARED, SIGNED
 AND SEALED BY A P.E., MUST BE PROVIDED IN ORDER FOR US
 TO REVIEW THE SITE PLAN FOR PEDESTRIAN AND BICYCLE
 CONNECTIVITY.
 - THE PREVIOUS COMMENTS ON PEDESTRIAN CIRCULATION
 94-207-B-13 WERE NOT ADDRESSED. - PLANNED DEVELOPMENT
 (PD) DISTRICT - THE APPLICANT SHALL DEMONSTRATE THAT
 THE PROJECT REQUIRING SUCH A WAIVER (PARKING) SHALL
 CONFORM TO THE CONCEPTS OF NEW URBANISM. THE PEDESTRIAN
 CIRCULATION NETWORK IS LACKING THE CONCEPTS OF NEW
 URBANISM. THE FOLLOWING IMPROVEMENTS WILL ASSIST IN THE
 PROJECT CONFORMING TO THE CONCEPTS OF NEW URBANISM:
 - REDUCE PEDESTRIAN CROSSING DISTANCE AT ALL
 INTERSECTIONS. THERE MAY BE OPPORTUNITIES TO SQUARE UP
 OR ADD CHANNELIZING ISLANDS AT THE INTERSECTIONS OF
 ELIZABETH / WILKINS AND WILKINS / CLARE AND TO ALSO ADD
 LANDSCAPE BULB OUTS ON THE OPPOSITE SIDE OF THE STREET
 FROM THE SITE. CONSIDER MOVE THE CROSSWALK CLOSER TO
 THE BULB-OUT. ALSO, CONSIDER REALIGNING CLARE AVENUE
 (WITH CURB) TO COME IN PERPENDICULAR TO WILKINS AVENUE
 TO REDUCE PEDESTRIAN CROSSING DISTANCE AND EXPOSURE OF
 BICYCLES TO VEHICULAR TRAFFIC. THESE ARE ALL IMPORTANT
 ELEMENTS IN PROVIDING FAVORABLE MULTI-MODAL FACILITIES
 TO ENCOURAGE ALTERNATE MODE OF TRANSPORTATION.
 - ADD MIDBLOCK CROSSING ON CLARE AVENUE.
 - ADD CROSSWALKS AND CURB RAMPS ON OTHER SIDE OF STREET
 FROM SITE TO ALLOW PEDESTRIANS TO WALK TO THE SITE.
 - PROVIDE SHADE TREES ALONG THE SIDEWALK. CONSIDER THE
 ADDITION OF SHADE TREES IN THE SIDEWALK AT THE END OF
 EACH PARKING SPACE AND IN THE LANDSCAPE STREET
 BULBOUTS. SIDEWALK COULD BE WIDENED INTO BUFFER TO
 ALLOW PASSING DISTANCE AT EACH TREE.
 - CONSIDER UNDERGROUND STORAGE OF STORMWATER ON THE
 WEST END OF THE SITE INSTEAD OF THE PROPOSED DRY
 RETENTION. THIS WOULD ALLOW THE AREA TO USED AS A
 PLAZA. IF DRY DETENTION IS RETAINED THEN CONSIDER
 PROVIDING A WIDER SIDEWALK ALONG WILKINS AND
 INTEGRATING IT INTO THE DRY DETENTION AREA.
  
  Print