| Date |
Text |
| 2018-04-02 13:43:42 | RE: CASE PB 1773- 1701 CLARE- RESUBMITTAL COMMENTS |
| | |
| | OUR COMMENT TO THIS PROJECT FALLS BACK TO ITEM #4 CCTV |
| | (VIDEO OF EXISTING CONDITIONS OF ADJACENT LINES) |
| | |
| | AT THIS TIME THE CITY'S PUBLIC UTILITY DEPARTMENT |
| | POSITION ARE THAT IT CANNOT COMMIT TO ANY SEWER |
| | CONNECTIONS PRIOR TO DETERMINATION OF WHAT EXISTING |
| | CONDITIONS ARE. ALL ADJACENT SEWER SYSTEMS SHALL BE |
| | RESEARCHED THRU CCTV. WE KNOW THAT LINES AND |
| | CONNECTIONS SHOWN ON THIS SUBMITTAL WHERE PREPARED FROM |
| | THE MOST RELIABLE DATA TO ACCOMODATE A PRELIMINARY |
| | DESIGN TO SATISFY THE PLANNING SUBMITTAL. HOWEVER THE |
| | CITY UTILITY DEPARTMENT HAS GENUINE AND JUSTIFIABLE |
| | FEAR THAT BY NOT HAVING THIS RESEARCH DONE THRU CCTV |
| | NOW AND REACH A SOLID DETERMINATION OF WHAT THE |
| | UNFORESEEN CONDITIONS, THE PROJECT COULD INCUR |
| | AVOIDABLE INFRASTRUCTURE COSTS IF PROPERLY IDENTIFIED, |
| | GAGED AND BUDGETED. BY PERFORMING THIS RESEARCH THE |
| | PROJECT WILL COMPLY WITH COMMENT #10 WHICH WILL BE TO |
| | IDENTIFY ANY SEWER SERVICE LATERAL TO BE CUT AND CAPPED |
| | AND IDENTIFY THE CORRESPONDING ROAD ROW RESTORATION OF |
| | SUCH LOCATION(S). |
| | |
| | MANNY GONZALEZ |
| | SENIOR ENGINEERING PROJECT COORDINATOR |
| | PUBLIC WORKS DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 |
| | (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 |
| | DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 |
| | EMAIL: [email protected] |
| | HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS |
| | /FORMS,-PERMITS-APPLICATIONS |
| | |
| |
Print |