2018-01-09 13:44:39FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 1315 ALPHA Z17120022
 JANUARY 9, 2018
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. PLEASE REVISE TREE CANOPY IMPACT PLAN SHEET LP-1 TO
 SHOW ALL PROVIDED TREES WITH CANOPY TOTAL. THERE IS A
 2712 SQ. FT. MITIGATION DEFICIT.
  
 2. TREES CAN BE ADDED IN THE SOUTH RIGHT OF WAY TO
 PROVIDE REQUIRED ROADWAY BEAUTIFICATION PER SECTION
 94-452, AND CAN BE USED TO PROVIDE MITIGATION. SHRUB
 PLANTINGS CAN BE ADDED TO CONNECT THE ROADWAY LANDSCAPE
 TO SITE LANDSCAPING, AND COMPENSATING FOR THE WAIVERS
 OF REDUCED SETBACKS.
  
 3. PLEASE PROVIDE SCREENING FOR BACKFLOW VALVES AND
 SHOW LOCATIONS AND PROVIDE SCREENING FOR ANY A/C UNITS.
 DETAIL IS PROVIDED, BUT SHOW LOCATIONS ON PLAN.
  
 4. PLEASE CORRECT THE TOTAL TREES PROVIDED, AS IT IS
 MORE THAN 19.
  
 5. PLEASE SHOW THE ADDITIONAL 12 TREES REQUIRED, ONE
 FOR EACH UNIT PER SECTION 94-443(D), IN THE LANDSCAPE
 DATA CHART.
  
 6. PLEASE PROVIDE LOCATIONS OF LIGHTING ON THE
 LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING.
  
 7. PLEASE CONSIDER A DIFFERENT SPECIES THAN THE
 MAGNOLIA TO PROVIDE MORE SHADE.
  
 8. PLEASE ADJUST THE BUFFER WIDTHS REQUIRED TO SHOW 10
 FEET ALONG MERCER AVE AND ALPHA ST REQUIRED, AND 5 FEET
 ON ALL OTHER BOUNDARIES.
  
 9. PLEASE SHOW LOCATIONS OF SEWER LINES ON THE
 LANDSCAPE PLAN AND RESOLVE CONFLICTS TREES AND PROVIDE
 ROOT BARRIER LOCATIONS. THE LOCATIONS OF SEWER LINES
 SHOULD BE ADJUSTED TO ALLOW TREES TO BE PLANTED IN THE
 OPEN LANDSCAPE AREAS IN FRONT OF THE UNITS.
  
  
  
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE
 RIGHT OF WAY LANDSCAPING AND IRRIGATION APPROVED WITH
 THIS PETITION.
  
 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE
 RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF
 WAY LANDSCAPING AND IRRIGATION AS PERMITTED AND
 INSTALLED. THIS WILL BE THROUGH A SEPARATE MAINTENANCE
 AGREEMENT WITH THE CITY.
  