| 2018-01-09 14:39:56 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. NEW FEMA FIRM MAPS AND TWO FEET OF FREEBOARD ABOVE |
| | BASE FLOOD ELEVATION FOR STRUCTURES IN SPECIAL FLOOD |
| | HAZARD AREA ARE NOW IN EFFECT. THE MAPS ARE AVAILABLE |
| | AT HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX? |
| | |
| | 2. UPDATE THE FLOOD INFORMATION ON THE BOUNDARY AND |
| | TOPOGRAPHIC SURVEY AND POSSIBLY ON THE SITE PLAN (SHEET |
| | A-1). |
| | |
| | 3. LABEL THE VERTICAL DATUM ON THE ENGINEERING PLANS. |
| | |
| | 4. USE THE CITY?S TRENCH-BACKFILL-PAVEMENT RESTORATION |
| | DETAIL (GC-9) IN LIEU OF THE PAVEMENT REPAIR DETAIL ON |
| | SHEET C-5. |
| | |
| | 5. SHOW UTILITIES ON THE LANDSCAPE PLANS. |
| | |
| | 6. PROVIDE MORE HORIZONTAL CLEARANCE BETWEEN THE |
| | PROPOSED CATCH BASINS AND FIRE LINE / WATER SERVICE |
| | LINE. |
| | |
| | 7. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED TO MEET |
| | SFWMD CRITERIA INCLUDING WATER QUALITY TREATMENT AND |
| | PEAK DISCHARGE. |
| | |
| | 8. PROVIDE A SWALE ALONG THE EAST PROPERTY LINE TO |
| | COLLECT THE STORMWATER RUNOFF BEFORE IT FLOWS ONTO THE |
| | ADJACENT PROPERTY. |
| | |
| | 9. PARKING ALONG OKEECHOBEE ROAD MAY REQUIRE A ?DEEPER? |
| | SWALE TO COLLECT THE STORMWATER RUNOFF AND DIRECT IT TO |
| | THE INTERNAL CATCH BASINS BEFORE IT FLOWS INTO THE |
| | OKEECHOBEE ROAD R/W. |
| | |
| | 10. SHOW ON THE ENGINEERING PLANS THE MILL AND |
| | RESURFACE LIMITS FOR THE TRENCH REPAIR IN THE RIGHT-OF |
| | WAY PER CITY DETAIL GC-9. |
| | |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |