| Plan Review Notes For Project Z17090003 |
| Project Number |
Z17090003 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2017-10-11 07:48:19 | 1. SEPARATE PLAT SUBMITTAL TO ENGINEERING FOR TECHNICAL | | | REVIEW IS REQUIRED. | | | 2. EASTERLY TRIANGULAR PORTION OF PROPERTY SHOULD BE | | | INCLUDED IN PLAT. | | | 3. NEED LOCATION OF ALL WATER AND SEWER SERVICES SHOWN | | | AS WELL AS DRAINAGE. | | | 4. CHECK COVER SHEET OF PLAT FOR NUMEROUS SPELLING | | | ERRORS. | | | 5. WHY DOES LOT 3 HAVE A HANDICAP SPACE? | | | 6. THE CREATION OF A POA(PROPERTY OWNERS ASSOCIATION) | | | MAY BE REQUIRED. |
| |
Print |
|