| Plan Review Notes For Project Z17080021 |
| Project Number |
Z17080021 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2017-10-16 13:08:19 | COMMENTS BELOW BASED ON THE OCTOBER 10, 2017 REVIEW | | | PACKAGE. REVIEWER WILL INDICATE PASS ON STATUS WITH THE | | | FOLLOWING CONDITIONS FOR APPROVAL (#1 AND #2). THE | | | ADVISORY COMMENTS (#3 AND #4) INDICATE PERMITS THAT | | | WILL NEED TO BE PROVIDED WITH THE ENGINEERING PERMIT | | | APPLICATION. | | | | | | 1. NO ENGINEERING PLANS PROVIDED (REPEAT COMMENT). | | | ALTHOUGH THE PROJECT SITE INCLUDES PREVIOUSLY | | | CONSTRUCTED DRAINAGE INFRASTRUCTURE, SIGNED AND SEALED | | | ENGINEERING PLANS WILL NEED TO BE SUBMITTED AT TIME OF | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | 2. NEW FEMA FIRM MAPS AND TWO FEET OF FREEBOARD ABOVE | | | BASE FLOOD ELEVATION FOR STRUCTURES IN SPECIAL FLOOD | | | HAZARD AREAS ARE IN EFFECT AS OF ON OCTOBER 2017. | | | UPDATE THE SURVEY TO REFERENCE THE NEW FLOOD MAPS AND | | | THE FLOOD ZONE(S) THAT THE PROJECT SITE IS IN (MODIFIED | | | COMMENT). | | | | | | 3. SFWMD ERP TO BE UPDATED. PROVIDE COPY OF REVISED | | | PERMIT WITH ENGINEERING PERMIT SUBMITTAL (ADVISORY | | | COMMENT). | | | | | | 4. LWDD PERMIT TO BE UPDATED. PROVIDE COPY OF REVISED | | | PERMIT WITH ENGINEERING PERMIT SUBMITTAL (ADVISORY | | | COMMENT). | | | | | | TRACY L. WARD, P.E. | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 | | | |
| |
Print |
|