| Plan Review Notes For Project Z17080018 |
| Project Number |
Z17080018 |
|
| Review Stop |
STORM |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2018-05-10 18:03:24 | THE FOILLOWING COMMENTS ARE FROM THE REVIEW OF THE MAY | | | 7, 2018 SUBMITTAL PACKAGE. | | | | | | 1. THE LANDSCAPE PLANS ARE NOT SHOWING THE LATEST | | | PROPOSED UTILITIES SHOWN ON THE CIVIL PLANS. INCLUDE | | | THE ROOF DRAINAGE PIPING ON THE PLUMBING SITE PLAN . | | | | | | 2. LABEL VERTICAL DATUM ON DRAINAGE PLAN AND WATER AND | | | SEWER PLANS. PROVIDE CONVERSION EQUATION TO NGVD 1929. | | | | | | 3. IDENTIFY WHICH DRAINAGE STRUCTURE(S) WILL BE CONTROL | | | STRUCTURES FOR RESTRICTING RUNOFF DISCHARGE FROM THE | | | SITE. | | | | | | 4. DDA NEEDED AFTER THE 8" GATE VALVE ON THE WATER MAIN | | | AT THE NORTHEAST CORNER OF THE PROPERTY. THE WATER MAIN | | | AFTER THE VALVE WILL BE A PRIVATE WATER MAIN. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | | | | |
| |
Print |
|