| 2017-12-13 14:59:49 | THE COOMENTS BELOW ARE FROM THE SET OF PLANS |
| | DISTRIBUTED THE WEEK OF 12/11/17: |
| | |
| | 1. THE SITE PLAN STILL SHOWS RETENTION POND WITH BLUE |
| | COLOR FOR WATER. THE CONCEPTUAL ENGINEERING PLAN SHOWS |
| | THE FEATURE AS A DRY DETENTION AREA. THE SITE PLAN WILL |
| | BE CHANGED TO LABEL THE AREA AS DRY DETENTION AND THE |
| | BLUE COLOR CHANGED. |
| | |
| | 2. THE CONCEPTUAL ENGINEERING PLAN IS NOT SHOWING THE |
| | LIMITS OF THE: |
| | A. UTILITY EASEMENT / RIGHT OF WAY EASEMENT ALONG THE |
| | NORTH PROPERTY LINE |
| | B. RIGHT OF WAY EASEMENT ALONG THE EAST PROPERTY LINE. |
| | |
| | THE ENGINEER HAS EMAILED TO SAY THE CONCEPTUAL |
| | ENGINEERING PLAN WILL BE RESUBMITTED WITH THE EASEMENT |
| | LINES SHOWN. |
| | |
| | 3. A FIRE HYDRANT IS SHOWN NEAR THE NORTHEAST CORNER OF |
| | THE PROPERTY. THE FIRE MARSHALL HAS REQUESTED THE FIRE |
| | DEPARTMENT CONNECTION BE MOVED TO BE NEAR THE FIRE |
| | HYDRANT NEAR THE ENTRANCE ROAD AT THE SOUTHWEST CORNER |
| | OF THE SITE. THIS CHANGE IN FDC LOCATION WILL BE MADE |
| | DURING ENGINEERING PERMIT APPLICATION SUBMITTAL. THE FH |
| | AT THE NORTHEAST CORNER OF THE SITE WILL NOT BE NEEDED. |
| | THIS FH WILL NOT BE ON THE PLANS FOR ENGINEERING PERMIT |
| | APPLICATION. |
| | |
| | 4. THE CONCEPTUAL ENGINEERING PLAN SHOWS THE EXISTING |
| | SANITARY SEWER GOING OUTSIDE OF THE 12' EASEMENT ALONG |
| | THE SOUTH PROPERTY LINE. THE SEWER SYSTEM ACTUALLY |
| | TURNS SOUTH BEFORE THE END OF THE EASEMENT AND CONNECTS |
| | TO THE OFFSITE SEWER MANHOLE SHOWN ON THE DRAWING. THIS |
| | CAN BE CORRECTED ON THE PLANS SUBMITTED FOR ENGINEERING |
| | PERMIT. |
| | |
| | 5. THE CONCEPTUAL ENGINEERING PLAN SHOWS A UTILITY |
| | EASEMENT AROUND THE PROPOSED FIRE HYDRANT AND WATER |
| | METER NEAR THE NORTHEAST CORNER OF THE PROPERTY. IF THE |
| | EXISTING 10-UTILITY EASEMENT ALONG THE NORTH PROPERTY |
| | LINE IS REMAINING THEN ANOTHER UTILITY EASEMENT IS NOT |
| | NEEDED. THE FIRE HYDRANT AND WATER METER APPEAR TO BE |
| | WITHIN THE EXISTING UTILITY EASEMENT. THE ENGINEERING |
| | EMAILED TO SAY THE REVISED ENGINEERING PLAN DRAWING |
| | WILL NOT SHOW THE PROPOSED UTILITY EASEMENT AROUND THE |
| | WATER METER AND FIRE HYDRANT. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | [email protected] |
| | 561-494-1120 |
| | |
| |