| Plan Review Notes For Project Z17080018 |
| Project Number |
Z17080018 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2017-10-16 16:54:46 | THE FOLLOWING COMMENTS ARE BASED UPON THE REVIEW OF THE | | | OCTOBER 5, 2017 SUBMITTAL PACKAGE. | | | | | | 1. LABEL THE VERTICAL DATUM ON THE CONCEPTUAL PAVING, | | | DRAINAGE, WATER AND WASTEWATER PLAN. IF DIFFERENT THAN | | | CITY'S VERTICAL DATUM, NGVD1929, THEN PROVIDE | | | CONVERSION FACTOR TO OBTAIN NGVD 1929. | | | | | | 2. SHOW ALL UTILITIES ON THE LANDSCAPE PLANS. THE | | | CONCEPTUAL ENGINEERING PLAN SHOWS STORM WATER PIPES | | | INTO THE DRY DETENTION AREA THAT ARE NOT SHOWN ON THE | | | LANDSCAPE PLANS. | | | | | | 3. CONCEPTUAL ENGINEERING PLAN LABELS THE OPEN FEATURE | | | IN THE SOUTHWEST CORNER OF THE SITE AS A PROPOSED DRY | | | DETENTION AREA. THE ARCHITECTURAL PLANS LABEL THE AREA | | | AS RETENTION POND. POND INDICATES PERMANENT WATERBODY | | | WHICH IS NOT THE SAME AS DRY DETENTION AREA. RETENTION | | | AND DETENTION ARE NOT THE SAME EITHER. | | | | | | 4. SFWMD HAS MINIMUM DIMENSIONAL REQUIREMENTS FOR WET | | | PONDS USED FOR WATER QUALITY TREATMENT. | | | | | | 5. SFWMD PERMIT TO BE SUBMITTED WITH ENGINEERING PERMIT | | | APPLICATION. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
| |
Print |
|