| 2017-09-07 13:23:35 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP:// |
| | WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER |
| | MITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. NEW FEMA FIRM MAPS AND TWO FEET OF FREEBOARD ABOVE |
| | BASE FLOOD ELEVATION FOR STRUCTURES IN SPECIAL FLOOD |
| | HAZARD AREAS WILL BE EFFECTIVE ON OCTOBER 5, 2017 IF |
| | RESOLUTION PASSES AT SECOND READING BEFORE CITY |
| | COMMISSION. THE MAPS ARE AVAILABLE AT |
| | HTTP://MAPS.CO.PALM-BEACH.FL.US/GIS/FLOODZONES.ASPX? |
| | |
| | 2. NO ENGINEERING PLANS WERE PROVIDED. |
| | |
| | 3. DEVELOPMENT IS LOCATED IN THE C-17 DRAINAGE BASIN. |
| | |
| | 4. MILITARY TRAIL RIGHT-OF-WAY IS MAINTAINED BY FLORIDA |
| | DEPARTMENT OF TRANSPORTATION. |
| | |
| | 5. 45TH STREET RIGHT-OF-WAY IS MAINTAINED BY PALM BEACH |
| | COUNTY. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION WILL |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION FOR |
| | THIS PROPOSED DEVELOPMENT. |
| | |
| | 3. PROVIDE A COPY OF THE NPBCID PERMIT MODIFICATION FOR |
| | THIS PROPOSED DEVELOPMENT. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |