Plan Review Notes
Plan Review Notes For Project Z17070013
Project Number Z17070013
Review Stop STORM
Sequence Number 3
Notes
Date Text
2018-01-05 16:35:22THE FOLLOWING COMMENTS ARE BASED ON THE PRINCIPAL
 PLANNER'S 1/2/2018 REVIEW PACKAGE:
  
 1. THE TRENCH DRAIN AT THE SOUTH DRIVEWWAY SHOULD BE
 REMOVED FROM THE SITE PLAN SHEET SP-1 AND THE LANDSCAPE
 PLANS.
  
 2. NOT ALL CATCH BASINS ARE SHOWN ON THE SITE PLAN
 SHEET SP-1. THE ONES THAT ARE SHOWN CAN BE REMOVED FROM
 THE SHEET.
  
 3. AN EROSION AND SEDIMENT CONTROL PLAN WILL BE
 REQUIRED WITH THE ENGINEERING PERMIT APPLICATION
 SUBMITTAL.
  
 4. THE CITY'S MILL AND RESURFACING LIMITS ARE 50 FEET
 ON EACH SIDE OF THE TRENCH CUT. FDOT MAINTAINS DIXIE
 HIGHWAY SO ITS REQUIREMENTS FOR MILL AND RESURFACING
 SHOULD BE FOLLOWED AND SHOWN ON THE ENGINEERING PLANS.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120